Laserfiche WebLink
Prioritv 1: Vantal?e Highwav Corridor Improvements <br />�. <br />PRIORITY #1: VANTAGE H W Y <br />CORRIDOR IMPROVEMENTS 1 4. <br />MP 21.25 1 s <br />NIP 27.51 � r <br />ISO <br />r <br />� r <br />�apeee OPPWWWRM Rntd. =CRT <br />wnwop�w <br />--fticl . <br />Lim— <br />• Guardrail replacement from MP 21.25 to MP 27.51 <br />ESTIMATED COST $1,165,973 <br />• Current Type 28 guardrail will be noncompliant with upcoming Vantage Highway overlay. <br />• Project will replace the noncompliant guardrail with Type 31. <br />• Public safety and liability issue if not addressed immediately. <br />16 <br />