Laserfiche WebLink
Schedule <br />Work to be executed when site conditions meet the acceptable conditions to facilitate the land <br />application of the treated septage. Crews lo work on site 0730 to 1530 Monday through Friday for <br />an estimated two weeks or until project completion. <br />Assumptions and Clarlflcatlons: <br />The following assumptions were used in preparation of the above costing: <br />• A mutually agreed upon Contract and Payment terms is established prior to any work <br />performed. <br />• Not inclusive of any state or local taxes. <br />• This Proposal based off of an estimated 800,000 gallons of septage, additional material will <br />constitute a change of scope and require a mutually agreed up terms prior to continued <br />processing. <br />• Gallonage data collected for Vacuum tankers and Frack tanks will be formulated utilizing <br />strapping charts and measuring sticks for recording volumes processed. <br />• Water will be available as needed. <br />• All contaminated equipment used will be washed down with water into the septage ponds <br />prior to leaving the site. All efforts will be made to use minimal water for equipment <br />decontamination. · <br />• This project has been identified a Prevailing Wage Project employee wages are based off <br />of the current appropriate wage determinations for Kittitas County, <br />If you have any questions about this proposal or need additional information, you can reach me by <br />cell phone at 509-316-6701 or via e-mail at i.l!S!latla@nrcc:.CQJll . We look forward to helping you <br />with this or any other environmental field service needs. <br />Sincerely, <br />Shawn Estrada <br />Pasco Operations Manager <br />NRG Environmental Services <br />1f~10 L Jn ines S l <br />fJ,JSC(l VV A ~930 I <br />Insert bid number <br />Prepared for XXX <br />Date <br />END of Scope <br />Phon e ~O!J-J 1 C,.G lO 1 <br />f:: 111811 seslrad.zi i~'.nr cc r::om <br />Professional Services Agreement (rev. 09/24/2018) <br />Page 24 of 28 <br />Insert project name <br />by NRG Environmental Services, Inc <br />Page 2