My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 5 CH2M
>
Meetings
>
2019
>
03. March
>
2019-03-19 10:00 AM - Commissioners' Agenda
>
Amendment 5 CH2M
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2019 1:08:12 PM
Creation date
3/25/2019 1:07:51 PM
Metadata
Fields
Template:
Meeting
Date
3/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
e
Item
Request to Approve an Amendment to the CH2M/Jacobs Agreement for the Site Permitting for the New Transfer Station Location
Order
5
Placement
Consent Agenda
Row ID
52323
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Surveyor shall produce electronic submittals of the triangulated surfaces in: <br />• AutoCAD and Civil 3D software platforms (Version 2017). <br />• The surface model's triangles must be displayed in 3D format. Softdesk or Land <br />Development *.tin files will not be accepted. If Civil 3D software is used, submit LandXML <br />files of all COGO and triangulated surfaces. <br />• All triangulated surfaces shall include an exterior 3D boundary at surface elevations. <br />• All survey data points shall be submitted in an Excel spreadsheet or delimited text file <br />formatted with point number, northing, easting, elevation, and description . <br />• All submitted survey information shall include the ties to the survey control points. <br />• Maintain complete accurate log of survey Work as it progresses and submit survey log book <br />in PDF format. <br />• Roadways: Survey grid points at 20-foot intervals and 0.25 foot cord height intervals on <br />horizontal curves . Survey superelevation application stations, horizontal and vertical <br />alignment points of curvature, and points of tangent locations . <br />• Open Areas: Survey grid points at 25-foot intervals and breaklines on 25-foot intervals. <br />• Ditches: Survey ditch cross-section at 20-foot intervals, including top of bank and flowline. <br />The survey information will be utilized into three-dimensional format by Jacobs using the AUTOCAD Civil <br />3-D for grade development and quantity take-offs. <br />The site mapping will be used to update the preliminary layout of the facility including onsite grading <br />contours, buffers (and setbacks), traffic flow patterns and travel lane requirements for customer and <br />operations traffic, civil grading around structures, tanks and fuel areas, and facility floor grades. <br />Assumptions: <br />• One boundary plat survey of the approximately 55-acre site <br />• One topographic survey of approximately 65 acres -assuming a 50' buffer around the site <br />• One Amerititle Report <br />• One Auditors recording fee <br />Deliverables : <br />• One topographic survey in AUTOCAD format <br />• One boundary plat survey <br />Subtask 2.2 Geotechnical Investigation <br />Geotechnical site characterization is needed to support development of geotechnical recommendations for the <br />proposed facilities and earthwork . Jacobs will complete an initial geotechnical field investigation consisting of test <br />pits and shear wave velocity measurements in projected areas of structure foundations, material borrow areas, <br />pavements, and fill placement areas to characterize subsurface conditions. Subsequent monitoring of groundwater <br />levels at the site will be performed .
The URL can be used to link to this page
Your browser does not support the video tag.