Product Qty.
<br />CRS-2P -Lo. COUill)'. 2000 Tons
<br />CRS-2P -Up. County 300 Tons
<br />CSSI 50% Dil. • Lo. County 100 Tons
<br />CSSI 50% Dil. • Up. County 50 Tons
<br />Subtotal
<br />Haz. Sub. Tax-0.70%
<br />WA SL Sales Tax-8%
<br />Total Schedule "A" •
<br />HFR-SP1 -Lo. County 2000 Tons
<br />HFR-SP1 -Up. County 600 Tons
<br />HFR-SP1 50% Di l. -Lo . Col!!l!t. _!.QQ_ Tons
<br />HFR-SP1 50% Dil. -U e , Coun!}: 50 Tons
<br />HFE-150 -Lower Countv 400 Tons
<br />HFE-150 -Uooer County 100 Tons
<br />·-~' :;-; -,.
<br />Subtotal
<br />Haz. Sub. Tax-0 .70%
<br />WA St. Sales Tax-8%
<br />Total Schedule "B" •
<br />1, . .,
<br />Idaho Asphalt Supply, Inc
<br />I 16425 W. Prairie Ave.
<br />Hauser, ID 83854
<br />,2081 a21-05so I
<br />UnltPrlc:e Haz. Tax [ Total Unit I
<br />Price
<br />$517.00 $3.62 I $520.62
<br />$517.00 $3.62 I $520.62
<br />$410.00 $2.87 $412.87
<br />$410 00 $2..87 $412 .87
<br />$1 ,250 ,600.00 $8 ,754.20 !
<br />Out of State. Plus Haz. Tax
<br />Not including Haz, Substance Tax
<br />I I
<br />$0.00 I I I --
<br />$0.00 I -
<br />$MO I ----
<br />$0.00 I i
<br />I
<br />$540 .00 $3.78 $543.78
<br />$540.00 $3 ,78 $543.78 I
<br />$ 270,000.00 I $ 567.00 I I
<br />Idaho Asphalt Notes :
<br />2019 LIQUID ASPHALT
<br />BID OPENING
<br />February 21, 2019 @2:00 p.m.
<br />Total Bid
<br />$1 ,041 ,238.00
<br />$156.185.70
<br />$41 .287.00
<br />$20.643.50
<br />$1,259,354.20
<br />$100,048.00
<br />$1,359,402.20
<br />$0 00
<br />$0.00
<br />$0.00
<br />$0,00
<br />$217,512,00
<br />$54,378 ,00
<br />$271,890.00
<br />$21,600.00
<br />$293,490.00
<br />2 hours Free Unloading Time/$100.00 hour thereafter_ Returned oil will be billed at full
<br />fre ight to job-site and 1/2 freight for returned product Fre ight pricing based on a 30 ton
<br />min . per load . Overnight holdover -$350 00 per night Restocking charge of $250 ,00
<br />No credit for altered/diluted product Job site pump--0ff -flat fee of $100 00 per
<br />occurance .
<br />Western States Asphaiti_ Inc.
<br />4327 North Thor Sl
<br />Spokane,WA 99217 I lf509l 487•560
<br />UnltPrlc:e I Haz. Tax I Total Unit I Total Bid
<br />Price
<br />$472.00 $0.00 I $472.00 $944 000.00
<br />$475.50 $0.00 r S47~.50 $142,650 00
<br />r I
<br />$342.00 $0.00 I $342.00 ~4.200 00
<br />I '
<br />$345.50 $0.00 $345.S0
<br />,
<br />$17 .-27S .00
<br />$1,138,125,00 $0 00 I I $1,138 ,125.00
<br />In State• Price to include Haz. Tax
<br />Not includin<i Haz Substance Tax $9t050_00
<br />I $1,229,175.00
<br />$0.00 I I $0,00 --
<br />$0.00 I $0.00
<br />$0.00 I $0 .00
<br />I
<br />$0.00 I $0.00
<br />I I I $452,00 $0.00 I $452.00 $180 800 .00
<br />I I --· --T
<br />$455.50 $0.00 $455.50 I $45,550.00
<br />$ 226,350.00 $ -I I $226,350.00
<br />I
<br />I $18 ,108.00
<br />$244,458.00
<br />Western States Asphalt Notes:
<br />Cancellations may be subject to fees for loss of truck operation plus $300 00 restocking fee for loads already
<br />loaded , Pumping is $60.00 per load Product return -$300 .00 per load , No credit given for diluted material or
<br />antistrip , Return freight. Full charge to destination and 1/2 freight back will be charged (Minimum charge on
<br />return of 20 tons). Spilt loads or delivery -Loads carrying two different products or loads with multiple partial
<br />unl oaa«19&;::nts will be charged an addiO0 nal $270.00 per load . D!lmu~e -$1 00.00~hour aft01' 2 hours.
<br />R~ueSla ol result in loads less than Iha 30 liin mini!IIU!ll will be uia1md an addlllonal !l'elghl c!,~!l(e on the
<br />difference between the minimum 30 ton load and the actual tons ordered by the County .
|