My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionTO16Amend1FairviewJacobs
>
Meetings
>
2019
>
02. February
>
2019-02-19 10:00 AM - Commissioners' Agenda
>
ResolutionTO16Amend1FairviewJacobs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 1:48:57 PM
Creation date
2/14/2019 1:48:46 PM
Metadata
Fields
Template:
Meeting
Date
2/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution Authorizing the Chair's Signature on Amendment No. 1 to Task Order No. 16 with Jacobs Engineering for the Fairview Road Culvert Replacement Project
Order
6
Placement
Consent Agenda
Row ID
51515
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cnsUo:S <br />e�J��� Co`Gngi <br />Si�SdT'�'ZT1oil5 C®�dNTY <br />DEPARTMENT OF PUBLIC WORKS <br />KI rT[T kS COL iN I V <br />ii. Assist the COUNTY as needed during worksite isolation, fish removal, and <br />planting. <br />2. Deliverables: <br />a. Responses to RFIs (electronic files) <br />b. RFI tracking log <br />c. Change Order / CRIP review documentation <br />d. Reviewed drawings / submittals with comments (electronic files) <br />e. Drawing submittal tracking log <br />TASK ORDER ASSUMPTIONS: <br />1. General <br />a. The Jacobs Project Manager has the ability to move budget/hours between Tasks to meet <br />deliverables. <br />b. The COUNTY is performing the following work: survey; utilities coordination and <br />arranging relocation; purchase of title reports; right-of-way plan development and filing; <br />bid documents; project advertisement. <br />2. Structural (TASK 06) <br />a. KPFF to provide technical specifications related to the PS&E they develop (culvert <br />portion only). <br />b. New culvert is assumed to be 28 feet long and 18 feet wide. Any change to these <br />dimensions will require an amendment. <br />3. Civil, Plans, and MOT assistance (TASK 08) <br />a. No assumptions added. <br />4. Construction Support (TASK 09) <br />a. Assumes up to eight RFI's received at four hours spent per RFI. <br />b. Assumes up to five Change Order review requests received at three hours spent per <br />change order. <br />c. Assumes up to six submittals for review at four hours per submittal. <br />d. Assumes one week of construction support, including preparation of the compliance plan <br />and attendance at one pre -construction conference for a total of 56 hours. <br />e. If additional construction support is needed, it can be added through amendment to this <br />task order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.