Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-267 <br />The YNCRP has identified two TCPs in the vicinity of NNR-3 that may be visually sensitive. Overall, <br />visual impacts of Route Segment NNR-3 are anticipated to be moderate to high because of the presence <br />of two TCPs. <br />Native American Concerns <br />Two TCPs have been identified along Route Segment NNR-3. Physical and visual impacts to the TCPs <br />are expected to be moderate to high. <br />4.11.4.13 Route Segment NNR-4o/NNR-4u <br />Route Segment NNR-4o/NNR-4u is 4.5 miles long. The area crossed is a combination of private property <br />and land managed by JBLM YTC and WSDOT. <br />Physical Impacts <br />The total amount of land within the 75 feet of the route segment centerline is 84 acres. Out of these 84 <br />acres, at least 61 acres (73 percent) have been surveyed for archaeological resources. Ten archaeological <br />resources are recorded within the Project study area, two unevaluated prehistoric lithic scatters and eight <br />prehistoric isolated finds that are unevaluated as to their National Register eligibility. There are no <br />architectural resources within 75 feet of the route segment centerline. One TCP has been identified. <br />Overhead Design Option Impacts <br />Short-term and long-term ground disturbance along Route Segment NNR-4o would total 23.0 acres. <br />Because of the presence of two archaeological sites, no architectural resources, and one TCP along this <br />route segment, physical impacts to cultural resources from the construction of the Overhead Design <br />Option are expected to be moderate to high. <br />Underground Design Option Impacts <br />Short-term and long-term ground disturbance along Route Segment NNR-4u would total 46.7 acres. <br />Because of the presence of two archaeological sites and one TCP along this segment, physical impacts to <br />cultural resources from the construction of Route Segment NNR-4u are expected to be moderate to high. <br />However, the potential for impacts to known sites and impacts resulting from the unanticipated discovery <br />of archaeological resources may be somewhat higher than under with Route Segment NNR-4o because <br />the amount of ground disturbance would be greater. <br />Visual Impacts <br />At least 205 acres (71 percent) of the land within 250 feet of the centerline of Route Segment NNR- <br />4o/NNR-4u have been surveyed for cultural resources. The two known archaeological sites are unlikely to <br />be sensitive to changes in visual setting. No architectural resources have been identified. One TCP has <br />been identified in the Project study area. <br />Visual impacts are anticipated to be moderate to high because Route Segment NNR-4o/NNR-4u would <br />cross a TCP. <br />Overhead Design Option Impacts <br />Because of the known TCP along this route segment, visual impacts to cultural resources from the <br />construction of NNR-4o are expected to be high. <br />Underground Design Option Impacts <br />Because of the known TCP along this route segment, visual impacts to cultural resources from the <br />construction of NNR-4u are expected to be moderate to high. However, the potential for visual impacts <br />resulting from the unanticipated discovery of cultural resources may be somewhat lower under this option