My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 2 <br />230 kV Transmission Line Project FEIS Proposed Action and Alternatives <br /> PAGE 2-19 <br />The Pacific Power realty specialist would explain the proposed transmission line project and contract to <br />the landowners. If agreeable to both the landowner and Pacific Power realty specialist, the contract would <br />be signed. <br />The executed contract would be recorded in the official records of the county, and the ROW corridor <br />would be insured with title insurance. The landowners would be paid the amount of the contract’s <br />consideration. All costs incidental to the contract’s execution, such as recording fees, closing costs, and <br />title insurance fees would be paid by Pacific Power. <br />If a necessary easement cannot be acquired through negotiation, Pacific Power may, in certain <br />circumstances, acquire the easement through eminent domain (condemnation) proceedings. Eminent <br />domain proceedings are a last resort and are only used if an agreement cannot be reached. Through the <br />eminent domain process, a court determines the just compensation paid to the private landowner. <br />After completion of construction, realty specialists would work with landowners to settle any construction <br />damages to landowner property. <br />2.2.3 Overhead Transmission Line Design Construction <br />Pacific Power would not initiate any construction or other surface disturbing activities on the public land <br />portion of the ROW corridor until written approval by all federal, state, and local authorizing entites has <br />been obtained. Authorizing entities include BLM, JBLM YTC, Reclamation, USACE, WSDOT, DNR, <br />Washington Department of Ecology, and the authorizing counties. <br />The specific authorization from the BLM would consist of a written Notice to Proceed (Form 2800-15). <br />The specific authorization from JBLM YTC would consist of a formal Determination of Availability from <br />the DASA, temporary construction Rights of Entry, and, if necessary, short term licenses for survey or <br />other pre-construction work. The specific authorization from Reclamation would consist of a written <br />Notice to Proceed. WSDOT’s specific authorization would consist of issuing a utility permit, an access <br />permit and granting an easement to cross WSDOT property. For a complete list of authorizations, permits, <br />reviews, and approvals, please see, Section 1.11 and Table 1-1. <br />Preconstruction conferences with each of the affected federal, state, and local agencies would be <br />conducted in order to introduce the contractors and their field representatives, discuss mitigation measures <br />and schedules, and introduce each agency’s point-of-contact prior to commencement of construction. As <br />construction proceeds, the construction engineer or inspector would continue to monitor activities to <br />ensure ROW compliance and to initiate modifications, where necessary. In environmentally and/or <br />culturally sensitive areas, an environmental specialist and/or agency and tribal personnel with appropriate <br />qualifications (i.e., biologist, archaeologist, etc.) would monitor construction activities to ensure <br />compliance with any required protections and/or mitigation. Following completion of the construction, <br />the transmission line would be mapped “as built” and separate construction project closure documents <br />would be submitted to each of the federal, state, and local agencies and tribes, as appropriate, for review <br />and agency record-keeping. Post-construction meetings with each of the agencies may be necessary to <br />review the construction process. <br />The following sections detail the transmission line construction activities and procedures for the proposed <br />Project. Construction equipment and work force requirements are described in Section 2.2.3.14. <br />Construction of the proposed transmission line is discussed in the following sections according to the <br />sequence of activities listed below.
The URL can be used to link to this page
Your browser does not support the video tag.