Vantage to Pomona Heights Chapter 4
<br />230 kV Transmission Line Project FEIS Environmental Consequences
<br />PAGE 4-229
<br />Table 4.9-2 Assumed Spending on Local Goods and Services for Construction
<br />INDUSTRY
<br />PERCENT OF TOTAL NON-LABOR, NON-
<br />ENGINEERING
<br />COST1
<br />PERCENT IN STUDY
<br />REGION
<br />TOTAL LOCAL EXPENDITURE
<br />IMPLAN SECTOR ALTERNATIVES
<br />A-H
<br />NNR
<br />ALTERNATIVE*
<br />NNR ALTERNATIVE
<br />- MR
<br />SUBROUTE
<br />Aggregate 0.01 100 $100,000 $80,000 $90,000 26
<br />Fencing and
<br />security 0.29 100 $37,298 $20,770 $23,769 323
<br />Preformed
<br />concrete 0.27 50 $17,214 $9,586 $10,971 162
<br />Electrical
<br />materials 79.58 2 $205,311 $114,333 $130,842 266
<br />Misc. materials 0.02 75 $2,152 $1,198 $1,371 330
<br />Real estate 1.36 100 $175,013 $97,461 $111,533 360
<br />Equipment rental 14.08 50 $908,061 $505,679 $578,694 365
<br />Research 0.20 100 $25,822 $14,380 $16,456 376
<br />Advertising and
<br />printing 0.76 50 $48,774 $27,161 $31,083 377
<br />Signage 0.07 75 $6,455 $3,595 $4,114 378
<br />Management
<br />consultants 0.56 25 $17,932 $9,986 $11,428 374
<br />Temporary hires 1.36 100 $175,013 $97,461 $111,533 382
<br />Misc. services 0.04 100 $5,738 $3,195 $3,657 389
<br />Fees 1.42 50 $91,810 $51,127 $58,509 432
<br />Totals 100.0 $1,816,594 $1,055,934 $1,193,961
<br />1Source: Wagner 2010, with adjustments to reflect percentages of non-labor, non-engineering costs. Percent local purchases assessed by
<br />Economic Planning Resources.
<br />*Agency Preferred Alternative
<br />4.9.4.2 Construction Worker Spending
<br />The construction work force was assumed to consist of 90 percent itinerant specialized transmission line
<br />construction workers and 10 percent local hires. Itinerant workers would move to the area for the length
<br />of their employment at the site, living primarily in transient accommodations (hotels and recreation
<br />vehicle [RV] parks), although a few may seek rental housing. This is an important consideration because
<br />wages paid to itinerant workers would mostly be saved with some of the per diem expenses (for lodging,
<br />food, and miscellaneous) paid for by the construction contractor(s). The itinerant workers' saved wages
<br />would ultimately be spent outside the Study Region, where the itinerant workers usually live, with only
<br />day-to-day living expenses being spent in the Study Region. Locally-hired workers would spend higher
<br />proportions of their wages in the Study Region.
<br />In sum, local spending by transient construction workers and site visitors is estimated to total $1.2 to 1.7
<br />million during the year of construction (assumed to be mid-2017-2018). The assumptions for local
<br />spending are shown in Table 4.9-3.
<br />Table 4.9-3 Spending by itinerant Construction and Other Visiting Personnel
<br />CATEGORY
<br />DAILY EXPENDITURES CONSTRUCTION TOTAL IMPLAN SECTOR ALTS A-H NNR ALT* NNR ALT - MR SUBROUTE ALTS A-H NNR ALT* NNR ALT - MR SUBROUTE
<br />Number workers 36.9 23.7 30.2 23.7 30.2 Number visitors 5 5 5 5 5 Lodging $40 $40 $40 $611,153 $419,706 $512,498 411
<br />Restaurants $20 $20 $20 $305,577 $209,853 $257,149 413
|