Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-223 <br />ROUTE SEGMENT RESIDUAL IMPACTS (MILES) <br />Low Moderate High <br />NNR-2 <br />5.0 miles 1.7 1.4 1.9 <br />NNR-3 <br />9.3 miles 8.3 0.3 0.7 <br />NNR-4o <br />4.5 mile 4.4 0.1 0 <br />NNR-4u <br />4.5 mile 3.8 0.4 0.3 <br />NNR-5 <br />1.8 miles 0.1 1.7 0 <br />NNR-6o <br />6.4 miles 6.4 0 0 <br />NNR-6u <br />6.4 miles 5.9 0.3 0.2 <br />NNR-7 <br />8.2 miles 8.2 0 0 <br />NNR-8 <br />2.7 mile 2.7 0 0 <br />MR-1 <br />11.9 miles 0.4 2.2 9.3 <br />4.8.8 Impact Summary by Alternative <br />4.8.8.1 No Action Alternative <br />Under the No Action Alternative, the proposed Project would not be built and no visual impacts would <br />occur. Scenic quality would not be affected and no change would occur to views from residences, <br />recreation areas, travel corridors, or other sensitive viewpoints. <br />4.8.8.2 Action Alternatives <br />Table 4.8-11 presents a summary of the residual impact levels for each Action Alternative following the <br />implementation of mitigation measures. <br />Alternative H would have the highest total mileage of high impacts on visual resources while the NNR <br />Alternative - Overhead Design Option would have the lowest total mileage of high impacts on visual <br />resources. Alternative B would have the highest mileage of moderate visual impacts and while the NNR <br />Alternative - Overhead Design Option would have the lowest total mileage of moderate impacts on visual <br />resources. Alternatives E, F G, and H would cause higher impacts on residences in the Moxee Valley. <br />Alternatives A, C, D, and H would cause higher visual impacts recreational viewers in the Saddle <br />Mountains, Milwaukee corridor, and residences located in the vicinity of Beverly. Alternatives B, C, E, <br />and G would have higher impacts on residences viewing from Desert Aire and recreationists using Priest <br />Rapids Reservoir. All Action Alternatives would be compliant with Interim VRM Class III designation. <br />Table 4.8-11 Visual Resource Residual Impact Summary by Action Alternative After Mitigation <br />ACTION ALTERNATIVE RESIDUAL IMPACTS (MILES) <br />Low Moderate High <br />Alternative A <br />1a, 1b, 2a, 2b, 2d, 3a, 3c <br />64.7 miles <br />16.5 37.9 10.3 <br />Alternative B <br />1a, 1b, 2a, 2b, 2d, 3a, 3b <br />61.2 miles <br />16.7 39.3 5.2