Laserfiche WebLink
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-213 <br />inhabitants in this location. The implementation of RDFs, such as the rehabilitation of vegetation <br />following construction would minimize the visual impacts on I-82 travelers at this crossing. <br />The route segment would also be viewed from residence located within Badger Pocket on the east end of <br />the route segment (Appendix C-3: KOP 19). Weak and moderate Project contrasts would be viewed from <br />this area as the route segment parallels and then crosses behind the existing Pomona-Wanapum 230 kV <br />transmission line in the middleground and background. Impacts on residences would be low to moderate. <br />Underground Design Option <br />Because primary viewers of this route segment are limited to I-82 travelers and that Route Segment NNR- <br />4u would require the installation of two 5-acre overhead to underground transition stations that would <br />create stronger structure and landscape contrasts than the Overhead Design Option, higher impacts are <br />expected in this section of the route segment (MP 1.0-1.4). Along most of the rest of the route segment, <br />because it crosses slightly sloping terrain (greater than 8%), landscape contrasts would be largely <br />screened by the heavy sagebrush vegetation as viewed by most travelers, although landscape contrasts <br />may be moderate. Therefore, beyond the overhead to underground transition stations, impacts would be <br />lower compared to the Overhead Design Option for this route segment. <br />From the Badger Pocket residential area, the overhead to underground transition station located on the <br />extreme east end of the route segment would cause strong to strong-moderate contrasts and be seen in the <br />middleground or background. Viewed behind the existing Pomona-Wanapum 230 kV transmission line, <br />the landscape and structure contrasts near the end of the line created by the presence of a five-acre <br />transition station that substantially deviates from the existing infrastructure would cause higher impacts <br />than the Overhead Design Option for the route segment in this location. <br />Agency Management Compliance <br />Overhead Design Option <br />Route Segment NNR-4o would be consistent with the visual standards identified in the Kittitas County <br />Comprehensive Plan. <br />Underground Design Option <br />The Route Segment NNR-4u would be consistent with the visual standards identified in the Kittitas <br />County Comprehensive Plan. <br />4.8.5.14 Route Segment NNR-5 <br />Visual Contrasts <br />Route segment NNR-5 is a short segment that deviates from the existing Pomona-Wanapum 230 kV <br />transmission line. Therefore, structure contrasts would be strong along most of the route segment except <br />in the areas near the existing transmission line on the east end. Because the line follows a portion of the <br />existing fire break road and is adjacent to other roads on JBLM YTC in an area of relatively flat terrain, <br />landscape contrast would be weak. Overall, Project contrast would be strong-moderate. <br />Pulling and tensioning sites would also cause short-term landscape and structure contrasts. The presence <br />of a helicopter during the stringing of the transmission line conductor wires would cause short-term <br />structure contrasts, potentially disrupting views or scenic vistas (e.g., toward the Cascade Mountains). <br />The temporary structure work areas, turn-around areas, and staging areas would cause low impacts due to <br />the duration of landscape and structure contrasts. Impacts from light sources would not occur because <br />construction would be limited to daylight hours. The potential for glare from the transmission line <br />conductors would be reduced with the use of non-specular conductors (RDF VIS-6).