Laserfiche WebLink
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-212 <br />Contrast Matrix). Similarly, because of the level of new access road construction (Access Level 2 and 3) <br />and minimal disturbance to shrub vegetation, landscape contrasts would be moderate to weak. Overall, <br />Route Segment NNR-4o would create weak to moderate-weak Project contrasts. <br />For the Overhead Design Option, pulling and tensioning sites would also cause short-term landscape <br />contrasts and structure contrasts. The presence of a helicopter during the stringing of the transmission line <br />conductor wires would cause short-term structure contrasts, potentially disrupting views or scenic vistas <br />(e.g., toward the Cascade Mountains). The temporary structure work areas, turn-around areas, and staging <br />areas would cause low impacts due to the duration of landscape and structure contrasts. Impacts from <br />light sources would not occur because construction would be limited to daylight hours. The potential for <br />glare from the transmission line conductors would be reduced with the use of non-specular conductors <br />(RDF VIS-6). <br />Underground Design Option <br />Structure contrasts created as a result of Route Segment NNR-4u would be limited to the presence of the <br />overhead to underground transition stations located adjacent to I-82 and at the beginning and end of the <br />route segments. In these areas, structure and landscape contrasts would be strong, resulting in strong <br />Project contrasts. Along the underground section of the route segment, contrasts would be the result of <br />duct bank and access grading in steep terrain where underlying soils and geology would be exposed in <br />potentially expansive hillside cut areas. In these areas, sagebrush or rabbitbrush vegetation removal would <br />also increase visual contrasts. Overall, Route Segment NNR-4u would result in moderate-weak to <br />moderate Project contrasts. <br />Scenic Quality Impacts and Development Character <br />Overhead Design Option <br />Scenic quality in the area of the Route Segment NNR-4o is influenced by the presence of the existing <br />Pomona-Wanapum 230 kV transmission line. Because Project contrasts are typically weak to moderate- <br />weak scenic quality impacts would be low to moderate. <br />WSDOT conducted a visual quality evaluation of the I-82 Crossing #2 south of Exit 11 based on the <br />FHWA’s Visual Impact Assessment for Highways methodology. Existing visual quality was rated as 4.83 <br />(high) at the highway crossing. With the implementation of the route segment at this location, the visual <br />quality of the highway in the area of the highway would drop to 4.25 (moderately high). There would be <br />some degradation of visual quality in the area of the transmission towers, but visual impacts would not <br />reach a substantial level (WSDOT 2014). <br />Underground Design Option <br />As with the Overhead Design Option, scenic quality in the area of Route Segment NNR-4u is influenced <br />by the presence of the existing Pomona-Wanapum 230 kV transmission line. However, because of the <br />presence of the overhead to underground transition stations and potentially large areas of cut and fill, <br />moderate to low scenic quality impacts would also result from the route segment. <br />Sensitive Viewer Impacts <br />Overhead Design Option <br />The primary viewers of Route Segment NNR-4o would be travelers using I-82 who would briefly view <br />the route segment as it crosses the interstate at MP 1.2-1.3 adjacent to the existing Pomona-Wanapum 230 <br />kV transmission line. Moderate impacts would result from the crossing structures in the vicinity of the <br />interstate and they would be less apparent and blend in with the existing structures. The implementation <br />of mitigation measures VR-2 and RDF VIS-7 would reduce the visual impact on the residences and