Laserfiche WebLink
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-162 <br />are not expected (see Section 4.11 - Cultural Resources). Hydrology and geological impacts will be low in <br />this area of the route segment. <br />4.6.4.11 Route Segment NNR-2 <br />Low impacts for 5.0 miles on the Yakima Hills IBA will occur as a result of the Project because there are <br />no specific management requirements in place as part of the IBA status on JBLM YTC. JBLM YTC is <br />recognized as an IBA based on the presence of Greater Sage-Grouse habitat. Approximately 3.7 miles of <br />the 5.0 mile route segment crosses the highly developed cantonment area of JBLM YTC that does not <br />provide Greater Sage-Grouse habitat. The general goal of the IBA program is to identify the most <br />essential areas for birds, monitor those sites for changes to birds and habitat, and work with land owners <br />and managers to conserve these areas for long-term protection. The construction, operation, and <br />maintenance of the transmission line would generally not conflict with this goal. However, specific <br />biological impacts to Greater Sage-Grouse are detailed in Section 4.3 - Wildlife and Special Status <br />Wildlife Species. <br />4.6.4.12 Route Segment NNR-3 <br />This Route Segment crosses the established and proposed expansion area of the Yakima River Cliffs and <br />Umtanum Ridge ACECs. The established and proposed areas occupied by the ACEC possess qualities <br />that make it special with regards to vegetation resources (basalt daisy [Erigeron basalticus], Hoover’s <br />desert-parsley [Lomatium tuberosum], and pauper milkvetch [Astragalus misellus var. pauper]). Moderate <br />impacts to these values and the ACEC would occur in the short-term due to potential relocation of plants <br />that cannot be avoided during the construction of the Project. With the implementation of RDFs and the <br />assumption that potential occurrences would be spanned and avoided, Project construction, operation, and <br />maintenance activities could cause some change or stress to plant populations, but will not contribute a <br />trend toward a change in agency (BLM or state) listing status. Therefore, short-term effects on these <br />values may occur to established or proposed ACECs, causing moderate or low impacts, respectively. <br />Approximately 0.7 mile of this route segment crosses lands recognized by Washington State Department <br />of Transportation (WSDOT) as an “environmental management buffer” managed primarily by WSDOT <br />for the protection of basalt daisy. No specific goals, objectives, standards, and policies are in place for the <br />management of this or any other resource, but the area has recognized value for habitat (WSDOT 2014). <br />As required by WSDOT, preconstruction surveys will occur to protect the resource and RDFs will be <br />implemented as part of the Project. These RDFs include: minimize disturbance to vegetation; minimizing <br />the blading of native plant communities during construction, operation, and maintenance consistent with <br />safe construction practices; utilizing existing public roads to the extent possible; and reseeding disturbed <br />areas with certified weed-free native or other acceptable species as approved by the appropriate land <br />management agency. Refer to Chapter 2, Section 2.3 for a complete list and description of RDFs. Because <br />of the implementation of these RDFs and because the environmental management buffer is a non- <br />regulatory designation with no specific management policies, impacts on the area will be low. <br />4.6.4.13 Route Segment NNR-4o/4u <br />No identified impacts will occur along the private and WSDOT managed portion of this route segment. <br />Low impacts would occur on the Yakima Hills IBA as a result of the Project because there are no specific <br />management requirements in place as part of the IBA status on JBLM YTC. The construction, operation, <br />and maintenance of either the Overhead Design Option or the Underground Design Option of the <br />transmission line would generally not conflict with the goals of the IBA program. However, specific <br />biological impacts to Greater Sage-Grouse will occur as a result of the implantation of either Design <br />Option and are detailed in Section 4.3 - Wildlife and Special Status Wildlife Species. <br />4.6.4.14 Route Segment NNR-5 <br />There are no SMAs associated with Route Segment NNR-5 and no impacts would occur.