My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-156 <br />ROUTE SEGMENT RESIDUAL IMPACTS (MILES) <br />NO IDENTIFIABLE LOW MODERATE HIGH <br />3a <br />0.1 mile 0.1 0 0 0 <br />3b <br />21.7 miles 19.4 0.6 1.7 0 <br />3c <br />25.4 miles 16.6 8.8 0 0 <br />NNR-1 <br />2.4 miles 2.4 0 0 0 <br />NNR-2 <br />5.0 miles 5.0 0 0 0 <br />NNR-3 <br />9.3 miles 0.9 8.4 0 0 <br />NNR-4o/4u <br />4.5 mile 0.2 4.3 0 0 <br />NNR-5 <br />1.8 miles 0 1.8 0 0 <br />NNR-6o/6u <br />6.4 miles 0 6.4 0 0 <br />NNR-7 <br />8.2 miles 0 8.2 0 0 <br />NNR-8 <br />2.7 mile 2.3 0.4 0 0 <br />MR-1 <br />11.9 miles 0.2 11.7 0 0 <br />4.5.7 Impact Summary by Alternative <br />4.5.7.1 No Action Alternative <br />Under the No Action Alternative, the proposed Project would not be constructed or operated. No Project- <br />related impacts to recreation would occur. <br />4.5.7.2 Action Alternatives <br />Table 4.5-4 presents a summary of residual impacts for each of the end-to-end Action Alternatives <br />following the implementation of the mitigation measures. <br />No Action Alternatives would have any high residual impacts. Alternative B, C, E, and G would each <br />have 1.7 miles of moderate residual impacts. The mileage of low residual impacts on recreation resources <br />would be highest for Alternative F and lowest for Alternative C. Combined no identifiable and low <br />impacts would be lowest and no moderate or high impacts would occur for the NNR Alternative <br />Overhead and Underground Design Options. <br />Table 4.5-4 Recreation Resources Residual Impact Summary by Action Alternative <br />ACTION ALTERNATIVE RESIDUAL IMPACTS (MILES) <br />NO IDENTIFIABLE LOW MODERATE HIGH <br />Alternative A <br />1a, 1b, 2a, 2b, 2d, 3a, 3c <br />64.7 miles <br />31.8 32.9 0 0 <br />Alternative B <br />1a, 1b, 2a, 2b, 2d, 3a, 3b <br />61.2 miles <br />34.8 24.7 1.7 0
The URL can be used to link to this page
Your browser does not support the video tag.