My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 4 <br />230 kV Transmission Line Project FEIS Environmental Consequences <br /> PAGE 4-145 <br />4.4.5 Mitigation Measures <br />The following mitigation measures have been identified to reduce, avoid, minimize, or rectify adverse <br />impacts to land use resources, specifically to agricultural resources. These mitigation measures would be <br />implemented where warranted and are anticipated to be effective. They are summarized in Table 4.4-3 <br />below. <br />Table 4.4-3 Vantage-Pomona Heights Transmission Project Mitigation Measures <br />MITIGATION MEASURE DESCRIPTION <br />LU-1: Modify Structure/ROW <br />Location <br />Within the standard limits of structure design, single pole and H-frame structures will be <br />located so as to allow adequate clearance for agricultural operations and irrigation canal <br />maintenance or to span or avoid sensitive land use features. Avoidance measures may <br />include structure micro-siting, placing access roads and structures at the edge of fields, <br />spanning features, taller structures, or the realigning of access roads and ROW <br />centerline. <br />LU-2: Modify Structure Type <br />To the extent practical, within standard structure design, and where not identified as a <br />required design feature, single-pole structures will be utilized to minimize ground <br />disturbance and operational conflicts and address site-specific constraints <br />LU-3: Stockpile Soils in Prime <br />Farmland <br />Any topsoil removed from areas designated as prime farmland or Farmland of Statewide <br />Importance will be scraped and stockpiled rather than covered over or removed. The <br />topsoil will then be used for erosion control and in areas of planting for best management <br />practices. <br /> <br />To minimize the effects of Project construction and operation conflicts with sensitive land uses, <br />mitigation measure LU-1: Modify Structure/ROW Location will be implemented in specific locations as <br />necessary. Mitigation measure LU-1 will be effective at reducing impacts by reducing the potential <br />operational and maintenance interference and other conflicts. This mitigation measure will be <br />implemented in the following locations: <br />• Route Segment 1c: MP 5.9-6.0, 9.5-10.5, and 11.3-11.4 <br />• Route Segment 2c: MP 9.5-11.2 and 13.1-14.7 <br />• Route Segment 3b: MP 14.7-15.1 and 17.3-19.0 <br />• Route Segment 3c: MP 5.3-14.3 <br />To minimize the effects of structure impedance on irrigation facilities and cropland, Mitigation Measure <br />LU-2: Modify Structure Type will be implemented in specific locations as necessary. Mitigation Measure <br />LU-2 will be effective at reducing impacts by reducing the structure footprint area and increasing <br />compatibility with agricultural operations. This mitigation measure will be implemented in the following <br />locations: <br />• Route Segment 2c: MP 13.1-14.7 <br />To minimize the effects farmland conversion and impacts on Prime Farmland, mitigation measure LU-3: <br />Stockpile Soils in Prime Farmland will be implemented in specific locations as necessary. Mitigation <br />Measure LU-3 will be effective at reducing impacts by preserving soil resources and minimizing the <br />effects of reduced Prime Farmland area. This mitigation measure would reduce impacts from moderate to <br />low in non-agricultural land. This mitigation measure will be implemented in the following locations: <br />• Route Segment 1a/NNR-1: MP 0.0-0.2 and 0.7-2.4 <br />• Route Segment 1b: MP 0.0-0.2, 5.4-5.8, 6.4-6.8, 9.3-9.5, 10.0-10.2, and 10.6-11.2 <br />• Route Segment 1c: MP 0.0-0.1 and 10.5-10.7
The URL can be used to link to this page
Your browser does not support the video tag.