My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-184 <br />3.7.4.16 Route Segment NNR-7 <br />This route segment parallels the existing Pomona-Wanapum transmission line and access roads through <br />the north end of JBLM YTC, as well as those roads servicing the existing Schultz-Wautoma and Schultz- <br />Vantage 500 kV transmission line corridor. <br />3.7.4.17 Route Segment NNR-8 <br />This route segment crosses Huntzinger Road and a secondary access road servicing the northeastern <br />portion of JBLM YTC and is shared by the John Wayne Pioneer Trail. Also, SR-243 is crossed in Grant <br />County south of the Vantage Substation and the Columbia River is crossed. Authorization to span the <br />Columbia River would be required from the USACE through the Section 10 Rivers and Harbors Act <br />permitting process. Temporary and permanent access and permission to span SR-243 would be <br />determined by WSDOT. <br />3.7.4.18 Route Segment MR-1 <br />This route segment does not follow existing roads, but crosses several roads accessing communication <br />facilities and private and public lands owned by Washington Department of Natural Resources and the <br />BLM on the west side of I-82. The route segment crosses I-82 south of the Manastash Ridge I-82 <br />Viewpoint and is southwest of the irrigation canal located at the boundary of Badger Pocket and JBLM <br />YTC. Permission to span I-82 would be determined by WSDOT and FHWA.
The URL can be used to link to this page
Your browser does not support the video tag.