My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Chapter 3 <br />230 kV Transmission Line Project FEIS Affected Environment <br /> PAGE 3-130 <br />Storage Study is to identify and examine the viability and acceptability of water storage alternatives. In <br />2006, Reclamation prepared an appraisal assessment of three other alternatives: the Bumping Lake <br />enlargement, Wymer Dam and Reservoir, and Keechelus-to-Kachess pipeline. The conclusions reached in <br />these two appraisal assessments were that the Black Rock and Wymer Alternatives should be included in <br />the Plan Formulation Phase of the Storage Study. The Wymer Dam Alternative is located within the <br />Project study area along Burbank Creek on private lands. Wymer Reservoir would be a 162,500 acre-feet <br />off-channel storage facility located in the intermittent stream channel of Lmuma Creek planned to be <br />developed on private and BLM-managed lands, which enters the Yakima River approximately 8 miles <br />upstream of the Roza Diversion Dam. <br />The Yakima River Basin Water Enhancement Project Phase III Act of 2015, introduced into the Senate in <br />June 2015, is specific legislation that would authorize the initial phase implementing the Yakima River <br />Basin Integrated Water Resource Plan (Integrated Plan). The Wymer Dam is included in the Yakima <br />River Basin Integrated Water Resource Plan. As part of the bill, the Department of the Interior would be <br />authorized to make grants for the purposes of watershed enhancement that could include conservation <br />easement or property purchases in the Project study area. As of December 2015, the bill had been passed <br />through the Senate Energy and Natural Resources Committee, and was placed on Senate Legislative <br />calendar under General Orders. <br />The Final Programmatic Environmental Impact Statement for the Integrated Plan was prepared jointly by <br />Reclamation and WDOE. Reclamation’s Integrated Plan provides water for agriculture, fish, and <br />communities by enhancing and protecting habitat. The Targeted Watershed Protections and <br />Enhancements program would acquire property or easements for protection of watersheds and key habitat <br />areas. Land acquisition and habitat enhancement components included in the Integrated Plan are intended <br />to result in a net improvement in conditions for Greater Sage-Grouse (Centrocercus urophasianus) and <br />other wildlife species by protecting and enhancing existing high value habitat areas within the Yakima <br />Basin. The Project study area contains private land parcels planned for purchase or establishment of <br />conservation easements to fulfil the land acquisition and habitat enhancement element of the Integrated <br />Plan. <br />3.4.3 Current Management Considerations <br />This section describes the general land use management goals and objectives related to transmission lines <br />and utility related infrastructure for the land/resource management agencies in the Project study area. <br />3.4.3.1 Federal <br />Bureau of Land Management <br />In the Project study area, the Spokane District of the BLM manages public lands in Grant, Kittitas, <br />Benton, and Yakima counties with the Saddle Mountains MA in Grant County constituting one of the <br />larger contiguous areas of BLM-managed land in the Project study area. The Spokane District manages its <br />land and resources in the Project study area using the 1985 Spokane District RMP, 1987 ROD, and the <br />1992 RMP Amendment and ROD. The RMP designated two utility corridors on BLM lands, one of <br />which is partially occupied by the Saddle Mountains BPA transmission lines in the Project study area and <br />the other is occupied by the Pomona-Wanapum 230 kV transmission line (see Appendix A - Land Use <br />Map). No other utility corridors are designated on BLM land in the Project study area. <br />The BLM is in the process of updating the Spokane District 1985/1987 RMP and 1992 RMP <br />Amendment/ROD. Since the public scoping process for this planning effort was initiated in April 2010, <br />the scope of this planning effort has changed. This planning effort only includes BLM-administered lands <br />in eastern Washington. Originally, the BLM announced its intention to prepare a Resource Management
The URL can be used to link to this page
Your browser does not support the video tag.