Laserfiche WebLink
Vantage to Pomona Heights Table of Contents <br />230 kV Transmission Line Project FEIS October 2016 <br /> PAGE xvi <br />TABLE 4.16-4 SUMMARY OF USDOT SHORT-TERM DURATION CONSTRUCTION NOISE GUIDELINES .... <br /> ................................................................................................................................... 4-339 <br />TABLE 4.16-5 TYPICAL ELECTRIC FIELD VALUES FOR APPLIANCES, AT 12 INCHES ....................... 4-342 <br />TABLE 4.16-6 SUMMARY OF USEPA GUIDELINES FOR MAGNETIC FIELD ...................................... 4-343 <br />TABLE 4.16-7 SUMMARY OF SPOT ROOM MEASUREMENTS OF 992 RESIDENCES IN THE UNITED <br />STATES (MG) ............................................................................................................ 4-344 <br />TABLE 4.16-8 PERCENTAGE OF U.S. POPULATION WITH AVERAGE FIELD EXPOSURE EXCEEDING <br />GIVEN VALUES (BASED ON 1998 POPULATION OF 267 MILLION) ............................ 4-344 <br />TABLE 4.16-9 AVERAGE MAGNETIC FIELD EXPOSURE DURING WORK FOR DIFFERENT OCCUPATIONS <br />IN THE UNITED STATES ............................................................................................. 4-344 <br />TABLE 4.16-10 ELECTRIC FIELD RESULTS FOR VARIOUS CONFIGURATIONS (KV/M) ....................... 4-346 <br />TABLE 4.16-11 CALCULATED MAGNETIC FIELD RESULTS ................................................................ 4-352 <br />TABLE 4.16-12 CONSTRUCTION EQUIPMENT NOISE LEVELS ............................................................. 4-363 <br />TABLE 4.17-1 SPATIAL AND TEMPORAL BOUNDARIES BY RESOURCE ............................................ 4-374 <br />TABLE 4.17-2 PAST, PRESENT, AND REASONABLY FORESEEABLE FUTURE ACTIONS WITHIN THE <br />PROJECT CUMULATIVE EFFECTS AREA ..................................................................... 4-375 <br />TABLE 4.17-3 PAST, PRESENT, AND REASONABLY FORESEEABLE FUTURE ACTIONS BY AFFECTED <br />RESOURCE ................................................................................................................. 4-393 <br />TABLE 4.19-1 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES ........................ 4-427 <br />TABLE 5-1 SCOPING MEETING DATES AND LOCATIONS ................................................................. 5-3 <br />TABLE 5-2 COMMENTS RECEIVED ON THE DEIS AND SDEIS ...................................................... 5-18 <br />TABLE 6-1 LEAD AND COOPERATING AGENCY PREPARERS AND CONTRIBUTORS ......................... 6-1 <br />TABLE 6-2 CONTRACTOR AND SUBCONTRACTOR PREPARERS AND CONTRIBUTORS ..................... 6-5 <br />TABLE 6-3 PROJECT PROPONENT PREPARERS AND CONTRIBUTORS .............................................. 6-7 <br /> <br />