My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Vantage to Pomona FEIS Index 34
>
Meetings
>
2018
>
12. December
>
2018-12-18 10:00 AM - Commissioners' Agenda
>
Vantage to Pomona FEIS Index 34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 1:49:29 PM
Creation date
12/13/2018 1:34:21 PM
Metadata
Fields
Template:
Meeting
Date
12/18/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Conduct a Closed Record Meeting to consider the Hearing Examiner's Recommendation for the Vantage to Pomona Transmission Line Conditional Use Permit (CU-18-00001)
Order
1
Placement
Board Discussion and Decision
Row ID
50108
Type
Conduct closed record hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
980
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vantage to Pomona Heights Table of Contents <br />230 kV Transmission Line Project FEIS October 2016 <br /> PAGE xvi <br />TABLE 4.16-4 SUMMARY OF USDOT SHORT-TERM DURATION CONSTRUCTION NOISE GUIDELINES .... <br /> ................................................................................................................................... 4-339 <br />TABLE 4.16-5 TYPICAL ELECTRIC FIELD VALUES FOR APPLIANCES, AT 12 INCHES ....................... 4-342 <br />TABLE 4.16-6 SUMMARY OF USEPA GUIDELINES FOR MAGNETIC FIELD ...................................... 4-343 <br />TABLE 4.16-7 SUMMARY OF SPOT ROOM MEASUREMENTS OF 992 RESIDENCES IN THE UNITED <br />STATES (MG) ............................................................................................................ 4-344 <br />TABLE 4.16-8 PERCENTAGE OF U.S. POPULATION WITH AVERAGE FIELD EXPOSURE EXCEEDING <br />GIVEN VALUES (BASED ON 1998 POPULATION OF 267 MILLION) ............................ 4-344 <br />TABLE 4.16-9 AVERAGE MAGNETIC FIELD EXPOSURE DURING WORK FOR DIFFERENT OCCUPATIONS <br />IN THE UNITED STATES ............................................................................................. 4-344 <br />TABLE 4.16-10 ELECTRIC FIELD RESULTS FOR VARIOUS CONFIGURATIONS (KV/M) ....................... 4-346 <br />TABLE 4.16-11 CALCULATED MAGNETIC FIELD RESULTS ................................................................ 4-352 <br />TABLE 4.16-12 CONSTRUCTION EQUIPMENT NOISE LEVELS ............................................................. 4-363 <br />TABLE 4.17-1 SPATIAL AND TEMPORAL BOUNDARIES BY RESOURCE ............................................ 4-374 <br />TABLE 4.17-2 PAST, PRESENT, AND REASONABLY FORESEEABLE FUTURE ACTIONS WITHIN THE <br />PROJECT CUMULATIVE EFFECTS AREA ..................................................................... 4-375 <br />TABLE 4.17-3 PAST, PRESENT, AND REASONABLY FORESEEABLE FUTURE ACTIONS BY AFFECTED <br />RESOURCE ................................................................................................................. 4-393 <br />TABLE 4.19-1 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENT OF RESOURCES ........................ 4-427 <br />TABLE 5-1 SCOPING MEETING DATES AND LOCATIONS ................................................................. 5-3 <br />TABLE 5-2 COMMENTS RECEIVED ON THE DEIS AND SDEIS ...................................................... 5-18 <br />TABLE 6-1 LEAD AND COOPERATING AGENCY PREPARERS AND CONTRIBUTORS ......................... 6-1 <br />TABLE 6-2 CONTRACTOR AND SUBCONTRACTOR PREPARERS AND CONTRIBUTORS ..................... 6-5 <br />TABLE 6-3 PROJECT PROPONENT PREPARERS AND CONTRIBUTORS .............................................. 6-7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.