My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-197
>
Meetings
>
2018
>
12. December
>
2018-12-04 10:00 AM - Commissioners' Agenda
>
Res-2018-197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 10:00:00 AM
Creation date
12/11/2018 9:57:57 AM
Metadata
Fields
Template:
Meeting
Date
12/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution for the 2019 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Washington State Horse Park Authority
Order
15
Placement
Consent Agenda
Row ID
49668
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Direct spending by exhibitors end spectators estimated at $7 .3 million <br />B. Total money flows, both direct and indirect estimated at $8.4 million <br />C. 143 jobs created <br />D. Direct, indirect end induced spending by out of state residents estimated at $1,460,000 <br />E. ''The recreational seivices sectors" will be the sectors most affected by the Horse Parle operations <br />The viability of the Horse Parle is evident in the way it plays to the strengths of the County as listed in the <br />report: <br />A. Outdoor recreation E. Development of Suncadia resort <br />B. Climate F. History (including western) <br />C. Premier sports facilities and even location G. Small town/rural character) <br />D. Interstate highway accessibility H. Natural beauty, open space <br />It is anticipated that at maturity, the Horse Park will be an economic engine that will facilitate and drive <br />private sector enterprise, especially retail, which is intrinsic to the value of recreational tourism to an <br />area. There is currently nothing else planned in Upper County that could have such n positive impact. At <br />this stage of development, the addition of a covered arena is expected to be the single most important <br />impetus in reaching the area's potential. <br />10. Indicate if other needed Infrastructure (e.g., sewer, water, power) is in place or if there is a plan <br />for getting it in place. <br />Utility infrastructure is in place at the Horse Park. Design and engineering of the covered arena includes <br />access to utilities on the grounds. <br />11. Indicate the Estimated Number of Businesses Created/Retained by the Project. <br />With the additional months of shoulder season activity allowed by the covered arena, the Horse Park <br />estimates an additional 22,528 visitors annually, nearly 15,823 incremental overnight stays of paid <br />lodging, and $2,882,000 of incremental economic impact (CWU study estimates the average visitor <br />spends $136/day for lodging and related expenditures). <br />Direct economic impacts of the WA State Horse Park will increase significantly with the buildout, but <br />examples of CU1Tent spending include (2017): <br />• Annual payroll: $203,000 (2 fulltime year round, plus 12 seasonal) <br />• Port-a-johns: $21,000 <br />• Equipment rentals: $16,000 <br />• Shavings: $27,000 <br />• Manure removal: $4,000 <br />• Temporary stall rentals: $16,000 <br />Importantly, since over 95% of visitors to the Park come from more than SO miles away, indirect <br />economic impacts include local area restaurants, grocers, hotels and home rentals, fuel, supplies, etc .. <br />Park visitors typically stay more than one night and travel in larger groups. <br />12. Indicate the Estimated Number of Jobs Created/Retained by the Project. <br />As reflected on the chart in section 8 above, the Horse Park has experienced strong growth in visitor <br />traffic and resulting overnight stays. Projecting forward, essentially all of the visitor and revenue growth <br />expected during 2018-22 is attributable directly or indirectly to development of the covered arena. The <br />Washington State Horse Park Distressed County Sales and Use Tax Grant Application pg12/25
The URL can be used to link to this page
Your browser does not support the video tag.