Laserfiche WebLink
Washington State Horse Park <br />Item <br />Trench, backfill, compaction <br />D. B. #10 <br />Panel <br />Pole base <br />Poles & Lamps <br />Connect to Utifrty <br />Item <br />Trencn, backfill, compaction <br />Piping <br />Connect to Gas Mein <br />Total <br />Item <br />Trench, backfill, compaction <br />0.8. Primary <br />compact <br />Connect to Main <br />Total <br />Item <br />Trench, backflH, compaction <br />Piping <br />Length Wrdth <br />3380 <br />3380 <br />1 <br />12 <br />12 <br />Gas <br />)Length~. ~Width <br />I 4340 <br />4340 <br />0 <br />Power <br />gth jwidth <br />SeeGas <br />4340 <br />4340 <br />0 <br />Water <br />Length !Width <br />4340 <br />4340 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Utilities <br />Height <br />fHel_g_ht <br />IHe!ght <br />IHe!i)ht <br />Aug-06 <br />·-.. GSF Cost/sf Cost <br />3,380 $2.13. $7,210 <br />3,380 $3.00 $10,140 <br />1 $1,200.00 $1,200 <br />12 $400.00 ·$4;800 <br />12 $3,000.00 $36,000 <br />1 $2,000.00 $2,000 <br />$61,350 <br />j~SF _ -_fCost/sf_ I Cost <br />4,340 · $2.13 $9,258 <br />4,340 $8.65 $37,541 <br />1 $2,000.00 $2,000 <br />[ $48,799 <br />IGSF least/sf lCest <br />$0 <br />4,340 $15.00 $65,100 <br />4,340 $4.00 $17,360 <br />1 $2,500.00 :::1 l <br />jGSF least/sf !cost <br />4,340 $8.08 $36,054 <br />4,340 $15.00 $65,100