Laserfiche WebLink
Washington State Horse Park <br />!Item <br />5/8'! Crushed Rock <br />Compaction <br />Paving <br />Curbs <br />Signs <br />FenclnQ <br />Round up . <br />Material Take off <br />Anal Gradingl3/4- <br />Entry Road <br />Units Lenath Width Amt $/Unit Unit$ GSF <br />Tons 3,000 . 26 1,040 $13.97 $14,529 78,000 <br />SF 3,000 26 78,000 <br />SF 3,000 24 72,000 <br />LF 6,000 1 6,000 <br />EA 1 $1 ,200.00 $1,200 ·o <br />tf 6 ,000 $12.00 $72,000 <br />Contractors OVerhead 12.0% <br />Contractors Profit 10.0% <br />Contractors Bid <br />Design Contingency 20.0% <br />Contingency 0.0% <br />Construction Estimate <br />Length Width Thickm CUFT CY K Factor Tons <br />3,000 26 3 19,500 722 1.44 1,040 <br />Aug-06 <br />Cost/sf Cost <br />$14,529 <br />$0.056 $4,329 <br />$2.00 $144,000 <br />$12.00 $72,000 <br />$1,200 <br />$72,000 <br />$308,058 <br />$36,967 <br />30,806 <br />$375,831 <br />$75,166 <br />$0 <br />$450,997 <br />$451 ,000