Laserfiche WebLink
Washington State Horse Park <br />Waste Holding Pens <br />Item Units Lengm Width Amt $/Unit Unit$ Cost/sf <br />Clearing & Grubbing <br />Remove Top Soil <br />Excavation <br />Ballast Rock <br />Grading <br />Concrete Foundation <br />Concrete Walls <br />Concrete Floor <br />Concrete Finish <br />Re-Bar <br />Lli:ihtirnJ <br />Material Take off <br />Base Roel< <br />Top Rock <br />Excavation <br />Concrete Foundation <br />Concrete Walls <br />Concrete Floor <br />SF 30 <br />CY 30 <br />CY <br />Tons <br />SF 30 <br />CY <br />CY <br />CY <br />SF <br />Job <br />Job <br />Length Width <br />20 <br />20 <br />20 <br />100 <br />100 <br />20 <br />20 600 $0.060 <br />20 22 .$5.83 <br />67 $5.625 $375 <br />8 $13.12 $105 <br />20 600 $0.048 <br />5 $78.23 $388 <br />15 $78.23 $1,159 <br />11 $78.23 $869 <br />1,200 $0.75 $900 <br />1 $400 .00 $400 <br />1 $2,000 n.ooo <br />Sub Total <br />Contractors Profit 12.0% <br />Contractors Overhead 10.0% <br />Contractors Bid <br />Design Contingency 20.0% <br />Cootin.gency 0.0% <br />Total <br />Amount of Units <br />Construction Estimate <br />Thickness CUFT . CY KFactor Tons <br />30 6 .300 11 1.44 <br />30 3 150 6 1.44 <br />30 36 1,800 67 <br />2 8 133 5 <br />6 8 400 15 <br />30 6 300 11 1.44 <br />Sep-06 <br />Laosf <br />Cost <br />$36.00 <br />$125.00 <br />$375 <br />$105 <br />$29 <br />$386 <br />$1,159 <br />$869 <br />$900 <br />$400 <br />$2,000 <br />$6,223 <br />$0 <br />$0 <br />$6,223 <br />1,245 <br />0 <br />7,488 <br />4 <br />$29,872 <br />$29,900