My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-197
>
Meetings
>
2018
>
12. December
>
2018-12-04 10:00 AM - Commissioners' Agenda
>
Res-2018-197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 10:00:00 AM
Creation date
12/11/2018 9:57:57 AM
Metadata
Fields
Template:
Meeting
Date
12/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution for the 2019 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Washington State Horse Park Authority
Order
15
Placement
Consent Agenda
Row ID
49668
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Washington State Horse Park <br />Waste Holding Pens <br />Item Units Lengm Width Amt $/Unit Unit$ Cost/sf <br />Clearing & Grubbing <br />Remove Top Soil <br />Excavation <br />Ballast Rock <br />Grading <br />Concrete Foundation <br />Concrete Walls <br />Concrete Floor <br />Concrete Finish <br />Re-Bar <br />Lli:ihtirnJ <br />Material Take off <br />Base Roel< <br />Top Rock <br />Excavation <br />Concrete Foundation <br />Concrete Walls <br />Concrete Floor <br />SF 30 <br />CY 30 <br />CY <br />Tons <br />SF 30 <br />CY <br />CY <br />CY <br />SF <br />Job <br />Job <br />Length Width <br />20 <br />20 <br />20 <br />100 <br />100 <br />20 <br />20 600 $0.060 <br />20 22 .$5.83 <br />67 $5.625 $375 <br />8 $13.12 $105 <br />20 600 $0.048 <br />5 $78.23 $388 <br />15 $78.23 $1,159 <br />11 $78.23 $869 <br />1,200 $0.75 $900 <br />1 $400 .00 $400 <br />1 $2,000 n.ooo <br />Sub Total <br />Contractors Profit 12.0% <br />Contractors Overhead 10.0% <br />Contractors Bid <br />Design Contingency 20.0% <br />Cootin.gency 0.0% <br />Total <br />Amount of Units <br />Construction Estimate <br />Thickness CUFT . CY KFactor Tons <br />30 6 .300 11 1.44 <br />30 3 150 6 1.44 <br />30 36 1,800 67 <br />2 8 133 5 <br />6 8 400 15 <br />30 6 300 11 1.44 <br />Sep-06 <br />Laosf <br />Cost <br />$36.00 <br />$125.00 <br />$375 <br />$105 <br />$29 <br />$386 <br />$1,159 <br />$869 <br />$900 <br />$400 <br />$2,000 <br />$6,223 <br />$0 <br />$0 <br />$6,223 <br />1,245 <br />0 <br />7,488 <br />4 <br />$29,872 <br />$29,900
The URL can be used to link to this page
Your browser does not support the video tag.