Laserfiche WebLink
m+ruttenas�ce / Construction of a 40 s 100 foot shop building with a 16-fo of cuing <br />Storage Skop (post and beam etructme) near the service road and close to the <br />arena area. Warkincluder clemiag. SrW*iug andinstalling 0„ of <br />base rock. 4" of l 1/4" top rock and a 4" concrete pad. 14 -bot <br />entry doors, mss doors, lighting andpower will support <br />maintenance oper"QUO and storage of egafgmen# and materisls. <br />PubUc 1"aciiities Funds to pay for adnwdstration duringglanningand con*truction. <br />Admin3sftison <br />06.00% <br />7vAatioa Factor Estimated to rease in Con"xrwPrice Index applied to phase 2 <br />and Phase 3. <br />TOTAL Pto tt7t:TC 11M <br />$171,100 <br />$1,014,791 <br />$1,450,519 <br />$18,384.599 <br />to <br />