Laserfiche WebLink
'*" Z bZ14 6: i�,r a• <br />400 ]toren stalls to be provided WM build eight SO.stall.post and $8,034,400 <br />beam strndmw 48feet wide by 388 feet long with 10 x 10 foot <br />stalls equipped with alldng gates. Ten A=vrater hydrants <br />located in each structure adllprovide any access for exhnAlmz. <br />Each barn will have two locations for hap storage and retrieval. <br />ROMad power and lighting with central switches will allow <br />sectional Xghtittgr aoz~tsol, Each barn will have a coacrste borne <br />washing ihcility. i <br />Waste Bolding 90 x 30 toot concrete holdingpen with raised concrete 40400t wide19,900 <br />Pen vrails an three nodes to koilitate the depositing artd removal using a <br />hmW end loader. <br />EKY Roads t leariag and brae rock installed under the site developnnetit $45I,000 <br />cOuftct. This project includes the installation of 3" of 3/4 mi;tuu� <br />topping, graded andralted with 8" cfpaviugfar the 3.000 x 84 %ot <br />Ofrmdway. Raised curbs and a Cense oa bath sides of the road A <br />new siga4 ideutiiying the Washington State Tutee Park is included, <br />WE faad the dmlop wmt of trails to connect the 68,mmW of $316,100 <br />Pathwayss and d rveloped land within tlw Hors* park site to th. ex;sting trail <br />��e Xreas sysk n hEtaution afw.altmys and pathways between the <br />covered arena, barking and exhibit barns are iucittded Ibis <br />trail syOk= WM access agproxittt"'T 80 addib=d acres that tray <br />be. aced for eventing course needs went at&* =Lin campus. <br />CaMOALRg Area An area new Me service road will be clewed end grabbed $28,100 <br />orgastic material and stimWa retnoved to clear for a 100 x 80 ibot <br />Pad for qts waste r tedal- Development at the pad will, con" of <br />0" of brae rock 4" of 11/4" top rack graders and rolled, and the <br />$nali mialsation of 8" otpaving. <br />rdvestoek The livestock holcUngpen will have a 80 x 80 footpad adwietittg of "$23.000 <br />xaldiaq Aorta G" of base rock, 4" of 11/4" top roalt, and finally 4" of floor <br />P=tatial. Perimeter fencing vdth control gates wM complete this <br />eel. <br />isiund" The save of that eienumt is the go=tructiou ofa 9,100 feet of ditch ir3ti,ToO <br />ti =the praperty tO Power tramdamer locations proVAed by Me <br />serving uWitiss. 4bia warn mcl udea the instsltatioon of security <br />li8htkgdlmg the road my, In addition to 1000Wae1 of Muk and <br />Aft ftm lite sewing t,Htity QAtY onto 5e db Prop" and to <br />ON =wend arta. Also indrinded is a 3,000 mot ditch, nuahole <br />valves avid 5rt hydrants for the ingt&uL& n *= &e Mudie, <br />water, sewer and kilgation syem to the end of the arena. Alow <br />voltage eonunarioation and security system wM be installed. <br />