My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveAgmt2019PFHorsePark
>
Meetings
>
2018
>
12. December
>
2018-12-04 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveAgmt2019PFHorsePark
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 1:18:01 PM
Creation date
11/29/2018 1:11:13 PM
Metadata
Fields
Template:
Meeting
Date
12/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
o
Item
Request to Approve a Resolution for the 2019 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with Washington State Horse Park Authority
Order
15
Placement
Consent Agenda
Row ID
49668
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'*" Z bZ14 6: i�,r a• <br />400 ]toren stalls to be provided WM build eight SO.stall.post and $8,034,400 <br />beam strndmw 48feet wide by 388 feet long with 10 x 10 foot <br />stalls equipped with alldng gates. Ten A=vrater hydrants <br />located in each structure adllprovide any access for exhnAlmz. <br />Each barn will have two locations for hap storage and retrieval. <br />ROMad power and lighting with central switches will allow <br />sectional Xghtittgr aoz~tsol, Each barn will have a coacrste borne <br />washing ihcility. i <br />Waste Bolding 90 x 30 toot concrete holdingpen with raised concrete 40400t wide19,900 <br />Pen vrails an three nodes to koilitate the depositing artd removal using a <br />hmW end loader. <br />EKY Roads t leariag and brae rock installed under the site developnnetit $45I,000 <br />cOuftct. This project includes the installation of 3" of 3/4 mi;tuu� <br />topping, graded andralted with 8" cfpaviugfar the 3.000 x 84 %ot <br />Ofrmdway. Raised curbs and a Cense oa bath sides of the road A <br />new siga4 ideutiiying the Washington State Tutee Park is included, <br />WE faad the dmlop wmt of trails to connect the 68,mmW of $316,100 <br />Pathwayss and d rveloped land within tlw Hors* park site to th. ex;sting trail <br />��e Xreas sysk n hEtaution afw.altmys and pathways between the <br />covered arena, barking and exhibit barns are iucittded Ibis <br />trail syOk= WM access agproxittt"'T 80 addib=d acres that tray <br />be. aced for eventing course needs went at&* =Lin campus. <br />CaMOALRg Area An area new Me service road will be clewed end grabbed $28,100 <br />orgastic material and stimWa retnoved to clear for a 100 x 80 ibot <br />Pad for qts waste r tedal- Development at the pad will, con" of <br />0" of brae rock 4" of 11/4" top rack graders and rolled, and the <br />$nali mialsation of 8" otpaving. <br />rdvestoek The livestock holcUngpen will have a 80 x 80 footpad adwietittg of "$23.000 <br />xaldiaq Aorta G" of base rock, 4" of 11/4" top roalt, and finally 4" of floor <br />P=tatial. Perimeter fencing vdth control gates wM complete this <br />eel. <br />isiund" The save of that eienumt is the go=tructiou ofa 9,100 feet of ditch ir3ti,ToO <br />ti =the praperty tO Power tramdamer locations proVAed by Me <br />serving uWitiss. 4bia warn mcl udea the instsltatioon of security <br />li8htkgdlmg the road my, In addition to 1000Wae1 of Muk and <br />Aft ftm lite sewing t,Htity QAtY onto 5e db Prop" and to <br />ON =wend arta. Also indrinded is a 3,000 mot ditch, nuahole <br />valves avid 5rt hydrants for the ingt&uL& n *= &e Mudie, <br />water, sewer and kilgation syem to the end of the arena. Alow <br />voltage eonunarioation and security system wM be installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.