My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResSalesandUseTaxAgmtCityofCleElum
>
Meetings
>
2018
>
11. November
>
2018-11-20 10:00 AM - Commissioners' Agenda
>
ResSalesandUseTaxAgmtCityofCleElum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 1:04:58 PM
Creation date
11/15/2018 12:54:21 PM
Metadata
Fields
Template:
Meeting
Date
11/20/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution for the 2019 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Cle Elum
Order
12
Placement
Consent Agenda
Row ID
49352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
urine' <br />by the resort or community. To the extent $tate law (including without limitations a tariff filed <br />with the Washington Utilities and Transportation Commission (WUTC) requires contrary cost <br />allocations, such sum law shall control. <br />GPO 6.31 Capital Facilities and Utilities may be sited, constructed, and operated by outside <br />public service providers (or sited, constructed, and/or operated jointly with a Master planned <br />Resort (MpR), limited area of more intensive rural development (LAMIRD), or Fully Contained <br />Community to the extent elsewhere permitted), on property located outside of an urban growth <br />area if such facilities and utilities are located within the boundaries of such resort or community <br />which is approved pursuant to County Comprehensive Plan policies and development regulations. <br />GPO 6.32 Electric and natural gas transmission and distribution facilities may be sited within and <br />through areas of Kittitas County both inside and outside ofmunicipal boundaries, UGAI% :blaster <br />Planned Resorts, LAMMDS, and Fully Contained Communities, including to and through rural <br />meas of Kittitas County. <br />GPO 633 Encourage joint electric utility construction standards for all electrical infrastructure <br />constructed in the UGA. In the interim, Puget Sound Energy and the Kittitas County Public <br />Utility District will allow the City of Ellensburg to review any new construction in the UGA. <br />GPO 6.34 Wind Farms may only be located in areas designated as Wind Farm Resource overlay <br />districts in the Comprehensive Plan unless they meet the criteria as may be developed under <br />GP06.35. Such Wind Farm Resource overlay districts need not be designated as Major Industrial <br />Developments under Chapter 2.5 of the Comprehensive Plan. <br />GPO 6.35 As allowed in GPO 2.10b and GPU 2, 10c, develop a study area encompassing the <br />entire qty to establish criteria and design standards for the siting of wind farms outside the <br />proem outlined in GPO 634. Criteria should include but not be limited to: <br />Location relative to residential development <br />Location relative to visual impacts <br />Location relative to audible impacts <br />Issues pertaining habitat and avian impacts <br />GPO 6.36 Develop a study areaencompassing the entire county to establish criteria and design <br />standards for the siting of solar finis. <br />Kittltas County December2016 <br />Comprehensive Plan 6.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.