Laserfiche WebLink
WATERSHED <br />SCIENCE & ENGINEERING <br />11 0 Prefontaine Place South, Suite 508 <br />Seattle, WA 98104 <br />Tel. (206) 521-3000 <br />TASK DESCRIPTION <br />1 Data Collection and Review <br />2 Field Reconnaissance <br />3. Survey Coordination --Stream Cross Sections, <br />4 Hydrologic Analysis --Flood Discharges <br />10 Hyarau11c Modeling <br />lot'ierdVerffica!,on ol Ryara ul,c Moae11ng <br />11. f-TOoa Hazara won< Map <br />B StUd.Y Re_port <br />9. FEMA Submittal and Coordination <br />11U Aa m1rnstrat1on <br />Tolal Hours and Direct Labor Cost (DL) <br />Labor Rale ($/hr) <br />TOTAL LABOR COST <br />Direct E)lpense D ·1 eta1 <br />Trn\lel to Project Site <br />R.oproducllon and Communication <br />Gage ·Materials <br />Cost S l:IIJlmary <br />Toial Labor <br />To'.a! Direct Expenses <br />Prin <br />4 <br />Road Crossings 0 ,5 <br />2 <br />B <br />~ <br />6 <br />2 <br />---4 <br />I 24 o I <br />I $2.!:!Sll I <br />$5,126 <br />Estimate of Professional Services <br />Prepared for: <br />Project: <br />Date: <br />Prepared By: <br />Sr. Eng . I Sr.En;-.11 <br />10 <br />13 <br />6 <br />6 <br />2 40 <br />12 <br />10 <br />30 <br />22 <br />" <br />20! 1:J-1.0 I <br />S-189.19 j SlSl.57 j <br />$378 $20,444 <br />Hours <br />·Sr,Solon. <br />Kittitas County <br />Reecer Creek <br />FEMA Flood Hazard Analysis and Mapping <br />October 9, 2018 <br />Chris Frei <br />Jr, llng , G1S:Spa•l•llt Comrw<>1 Admln , Totals <br />10 I $2.55 5 <br />,-13 ---$4,176 <br />1 ~ <br />I <br />2 ~ <br />122 72oim <br />15 1~ <br />zo II, ~o.44J <br />24 I $8,330 <br />10 bill <br />~ 4 - <br />ooi iou .o I ool 40 1 <br />$12$.20 I $102.97 j Slll-!.IIJ I "50,D j <br />$0 $20,388 $0 $226~ <br />Unlu Rnre co,1 <br />936 $0.545 $51 0 <br />~5Q <br />Total Z!i60 <br />S5",420 <br />5560 <br />Total ·$64,980