Laserfiche WebLink
Adding the $97 million in recommended maintenance and preservation expenditures over 20 years to <br />the $73 million in projected operating expenditures over 20 years yields a total of $170 million in total <br />operating, maintenance, and preservation expenditures. <br />The projected transportation operating expenditures, shown in Exhibit 11 below, estimate the costs of <br />providing the same services that occurred during the historical period (2008 to 2017). Exhibit 1 l does <br />not include the $127 million in estimated costs to complete the capital projects list. <br />Exhibit 11. Total Projected Operating Expenditures for Transportation, 2018 to 2037 (2018$) <br />2018-2023 <br />(Years 1 · 6) <br />2024-2027 <br />(Years 7 -10) <br />10-VearTotal, <br />2018-2027 <br />(Years 1-10) <br />2028-2037 20-Vear Total, <br />2018-2037 <br />(Years 11-20) (Vear_s 1-20) <br />Total Revenue $ 60,440,000 $ 40,635,000 $ 101,075,000 $ 105,437,000 $ 206,512,000 <br />Administration and Overhead <br />Facility Operations <br />Other Operations <br />Planning <br />Engineering <br />Parks and Trails Maintenance <br />Total Operating Expenditures <br />Maintenance and Preservation Expenditures <br />$ 7,150,000 $ 4,261,000 <br />$ 439,000 $ 324,000 <br />$ 8,227,000 $ 6,078,000 <br />$ 1,048,000 $ 774,000 <br />$ 2,642,000 $ 2,511,000 <br />$ 30,000 $ 24,000 <br />$ 19,536,000 $ 13,972,000 <br />$ 29,100,000 $ 19,400,000 <br />$ 11,41,t,OOO <br />$ 7~,000 <br />s 14,30~.ooo <br />$ <br />$ <br />$ <br />$ <br />$ <br />1.,822 000 <br />5 ,~3000 <br />54,000 <br />33,.SQSlOOO <br />48iSOOlOOO <br />$ 9,001,000 : $ 0,4'12,<Jgp <br />$ 925,000 $ 1,688,000 <br />$ 17,332,000 $ 31,~7;000 <br />$ 2,207,000 $ 4,029,0QO <br />$ 10,412,000 $ 1S,~S 000 <br />$ 79,000 • S-.133;000 <br />$ 39,956,000 $ 73,464,000 <br />$ 48,500,000 $ 97.000,000 <br />Total Operating, Maintenance & Preservation Costs $ 48,636,000 $ 33,372,000 $ '82,008,000 $ 88,456,000 $ 170,464,000 <br />Sources: Kittitas County Public Works 2018; BERK Consulting 2018; Fehr and Peers 2018. <br />Notes: Other Operations above only includes items that are not already included in Maintenance and Preservation <br />Expenditures. These figures are rounded to the nearest 1,000. <br />FUTURE CAPITAL NEEDS <br />Capital expenditures for transportation mainly come from construction of new facilities, such as roads, <br />sidewalks, and traffic signals. County staff prioritized the capital projects, and the countywide cost of the <br />transportation capital project list is $127 million. This includes $20 million for bridge replacements that <br />are structurally deficient or functionally obsolete, as well as $41.5 million for bridges past their useful <br />life, which is 75 years according to the Washington State Department of Transportation standard. <br />If any of the costs currently included on the capital project lists are recapitalization of assets (restructuring <br />the debt and equity structure of assets), then the funding for those costs would not be restricted to <br />capital-only grant funds. <br />Structurally deficient refers to bridges in poor condition that require repair or replacement of a certain <br />component, such as cracked or spelled concrete, the bridge deck, the support structure, or the entire <br />bridge itself. If bridges are no longer able to carry their intended traffic loads, they may be weight- <br />restricted, and these are typically the first priority for replacement. Functionally obsolete bridges, which <br />are assessed by comparing the existing design of each bridge to current standards, can be characterized <br />by substandard bridge widths, low vertical clearance that can lead to repeated damage from over <br />height trucks, load-carrying capacity, or for potential flood damage. <br />: ~I I May 22, 2018 Kittitas County Public Works I 20-Year TIP Fiscal Sustainability Strategy: Final Report 13