Laserfiche WebLink
State of Washington, Department of Ecology <br />IAA No. C1800153 <br />APPENDIX A <br />STATEMENT OF WORK AND BUDGET <br />Task 1 — Meter Procurement and Installation <br />1.1 The County will establish and maintain a contract with a vendor capable of delivering an Advanced <br />Metering Infrastructure (AMI) System. <br />• The County will ensure that the service provider's data management system is <br />accessible by both the County, the pilot project participant (metered property owner), <br />and Ecology. <br />• The County will ensure that the vendor's data management system meets Ecology's <br />data needs as defined in the Technical Requirements section of Appendix B. If those <br />data needs are not completely satisfied through the vendor's data management <br />system, then it will be the responsibility of the County to provide that data to <br />Ecology. <br />• Any Kittitas County competitive solicitation and awarded contract for equipment <br />needed to accomplish the work outlined in this IAA shall identify other counties as <br />authorized purchasers. <br />1.2 The County will purchase Meters and Meter Registers. <br />1.3 The County will contract for Meter Installation Costs. <br />Task 2 — Pilot Program Administration and Outreach <br />■ The County will ensure that all existing meters within their current metering program <br />are retrofitted with the AMI -capable meter registers or replaced in their entirety with <br />AMI -capable meters if necessary. <br />• The County will ensure that AMI -capable meters are installed and functional prior to <br />occupancy for all building permit applicants that meet the criteria as stated in the <br />technical requirements section. <br />• The County will distribute Ecology's most recent version of the Pilot Program <br />Information Packet to all qualifying Pilot Project building permit applicants. <br />• The County will ensure that AMI -capable meters are installed per the installation <br />requirements listed in the Technical Requirements section of Appendix B. <br />• The County will ensure that all account information, as outlined in the technical <br />requirements section, is entered into the AMI data management application within 30 <br />days of meter installation. <br />• The County will ensure that owner/participant information for each installed meter is <br />updated within the service provider's data management system when ownership of <br />the property changes. <br />• In the case of property ownership changes the County will ensure that the new <br />owner(s) is sent an Ecology -provided Pilot Project Information Packet as <br />described above. <br />Version 8/29/16 <br />