BOWERS FIELD -AIRPORT MASTER PLAN <br />Task 4.3 -Prepare SO-Vear Aviation Activity Forecast <br />The Consultant will develop a SO-year forecast of based aircraft and annual aircraft operations to <br />supplement the 20-year master plan forecasts. The SO-year forecast will extrapolate the preferred 20- <br />year forecasts, adjusted as needed to reflect long-term population forecasts and FAA long-term <br />aerospace forecasts . The SO-year forecast will be used to approximate long-term aviation use land <br />requirements for the airport. <br />Task 4.4 -Develop Forecast Working Paper <br />The Consultant will develop a detailed working paper describing the tasks outlined above . The draft <br />working paper will provide information for subsequent decisions. This working paper will be submitted <br />to Kittitas County and FAA for review and comment approximately two weeks prior to scheduled <br />meetings (See Element 15 for document distribution details). The draft working paper will be distributed <br />to the planning advisory committee at least one week prior to a scheduled meeting. Approval of the <br />forecast by the FAA, (or agreement to proceed without approval) will be required prior to <br />commencement of Element Four. <br />Product: A narrative and graphical summary of the forecasting analysis; the working paper will be <br />revised as necessary based on review comments and will become a chapter of the 2015-2035 Airport <br />Master Plan report. A PAC meeting will be conducted to present the findings of the forecast analysis to <br />the PAC. <br />Task 4.5 -Forecast Approval <br />The Federal Aviation Administration (FAA) Seattle Airports District Office (ADO) will review forecasts of <br />aviation demand. Based on its review, the ADO will approve the forecasts as submitted, or provide <br />comments and request revisions to be made by the Consultant (for subsequent review by the FAA <br />Seattle ADO and FAA Headquarters). <br />Product: FAA comment/approval of forecasts. <br />ELEMENT S · FACILITY REQUIREMENTS <br />The facility requirements analysis will address the airport's ability to accommodate airside and landside <br />facility needs based on the updated aviation activity forecasts and the selection of the current and <br />future design aircraft (Element 3). The updated facility requirements analysis will quantify demand and <br />provide a comparison with the previous master plan/needs assessment projections. <br />~/D'ceNTURY Wl!ST <br />~, 1.M.1.\IU(,\;i .~(t,V6liit1i),-Page I 16