My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-142 Bowers Field Master Plan Update
>
Meetings
>
2018
>
09. September
>
2018-09-04 10:00 AM - Commissioners' Agenda
>
Res-2018-142 Bowers Field Master Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2018 3:32:37 PM
Creation date
9/10/2018 3:31:43 PM
Metadata
Fields
Template:
Meeting
Date
9/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution to Authorize the Chair's Signature on the Contract Amendment with Century West for the Master Plan Update at Bowers Field
Order
6
Placement
Consent Agenda
Row ID
47519
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWERS FIELD-AIRPORT MASTER PLAN <br />CONTROL SURVEYING <br />The aerial photography will be completed with ABGPS control which will be used for the base control for <br />the geo-referencing of the aerial imagery. We will process the ABGPS data using COR stations and <br />reference it to the project control datums: <br />Horizontal: North American Datum of 1983/2011 (NAO 83(2011)), in the Washington State Plane <br />Coordinate System, North Zone in US survey feet. <br />Vertical: North American Vertical Datum of 1988 (NAVO 88) <br />We will complete all of the remaining on-site ground control surveys, including: <br />• Geodetic control validation of the existing airport PACS and SACS stations or establish temporary <br />airport control according to the guidelines established in AC 150/5300-16A <br />• Obtain all necessary ground control photo identifiable control check points required to validate the <br />ABGPS control. <br />• Control of all the airport runway end positions <br />• Collection of vertical profiles for all runways <br />• Collection of the position, elevation, and where required the appropriate navigational aid <br />perpendicular point of all electronic and visual navigational aids (NAVAIDS) located on the airport <br />and associated with any current instrument approach servicing the airport <br />• Control for any obstruction obstacles or airport planimetric features that cannot be collected by <br />photogrammetric methods <br />• Complete map checks for feature attribute data and update the final map file attribution <br />• Preparation and upload of a survey and quality control plan, Imagery plan, and final project report <br />as required for submission to the FAA AGIS online database. <br />• All other tasks, not specifically listed above, as outlined in FAA AC-18B, Table 2-1 "Survey <br />Requirements Matrix for Airport Layout Plan." <br />ORTHOPHOTO MAPPING <br />We will use the control solution and scans of the aerial negatives to generate a Digital Elevation Model <br />(DEM) for the VG surfaces. The aerial scans will be processed into color digital orthophotos using the <br />aforementioned DEM to rectify the images. Orthophotos for the entire project area will be developed <br />with a 1.0' pixel resolution and be delivered in a GeoTIFF file format via external hard drives <br />VGA OBSTRUCTION SURVEYS <br />The VGA Obstructions Surfaces will satisfy the following requirements of the AC 150/5300-188: <br />• 2.7.1.2 Analysis of Runway 11/29 (to be renumbered 12/30 Mag. Dec) and Runway 7/25 with <br />Vertically Guided Operations <br />(Surfaces include the VGRPS, VG PCS, VGAS, VGPS, VGATS, VGHS and VGCS) <br />Page I 5
The URL can be used to link to this page
Your browser does not support the video tag.