My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveContractAmendmentCenturyWest
>
Meetings
>
2018
>
09. September
>
2018-09-04 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveContractAmendmentCenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 1:25:58 PM
Creation date
8/30/2018 1:23:53 PM
Metadata
Fields
Template:
Meeting
Date
9/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution to Authorize the Chair's Signature on the Contract Amendment with Century West for the Master Plan Update at Bowers Field
Order
6
Placement
Consent Agenda
Row ID
47519
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWERS FIELD --AIRPORT MASTER PLAN <br />The following work program describes the effort required to successfully complete the Master Plan for <br />Bowers Field within the FAA framework. This project will provide Kittitas County with a 2015-2035 <br />Airport Master Plan and revised Airport Layout Plan (ALP) drawings. An updated Airport Capital <br />Improvement Program (ACIP) will provide Kittitas County with a method and proposed schedule for <br />addressing future facility needs through use of FAA Airport Improvement Program (AIP) grants and other <br />available funding sources. The master plan -defined ACIP will subsequently be used to identify project <br />priorities with the State Capital Improvement Program (SCIP), which is administered by WSDOT Aviation <br />in close coordination with FAA. <br />The project will address and/or update the basic tasks and work elements as outlined in FAA Advisory <br />Circulars 15015070-68, Airport Master Puns (Change 2) and 150/5300-13A Airport Design (Change 1). <br />The most current FAA Standard Operating Procedures (SOP) 2.00 and 3.00 will be prepared and <br />submitted with the draft airport layout pian drawing set. FAA SOP 2.0 and 3.0 address agency review <br />and approval requirements for Airport Layout Plan and Exhibit A Property Plan drawings. <br />The master plan update and AGIS survey include the following major work elements: <br />• Element 1 -Study Initiation and Management; <br />• Element 2 -AGIS Survey <br />• Element 3 -Airport Data Collection and Facilities Inventories; <br />• Element 4 - Aeronautical Activity Forecasts and Demand Capacity Analyses; <br />Element 5 - Facility Requirements; <br />Element 6 - Summary of Environmental Status; <br />• Element 7 - Alternatives Analysis; <br />• Element 8 - Airport Layout and Terminal Areas Plans; <br />• Element g - Compatible Land Use Planning in the Vicinity of Airports; <br />• Element 10 - Prioritized Capital Improvement Program and Cost Estimates; <br />• Element 11 -Airport Financial Plan; <br />• Element 12 - Agency Coordination; <br />• Element 13 - Public Participation and Information Process; <br />• Element 14 - FAA Compliance issues & Recycling and Solid Waste Management Pian; and <br />• Element 15 - Reports and Documentation <br />The AGIS survey identified in Element 2 will be used throughout the master pian project and will provide <br />technical data for the Airport Layout Plan drawing set. The AGIS survey will also be used to support FAA <br />Flight Procedures Office (FPO) changes to existing Instrument procedures and development of new <br />procedures. <br />�,yprC.lNTURY WEST <br />
The URL can be used to link to this page
Your browser does not support the video tag.