My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveContractAmendmentCenturyWest
>
Meetings
>
2018
>
09. September
>
2018-09-04 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveContractAmendmentCenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 1:25:58 PM
Creation date
8/30/2018 1:23:53 PM
Metadata
Fields
Template:
Meeting
Date
9/4/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
f
Item
Request to Approve a Resolution to Authorize the Chair's Signature on the Contract Amendment with Century West for the Master Plan Update at Bowers Field
Order
6
Placement
Consent Agenda
Row ID
47519
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOWERS FIELD — AIRPORT MASTER PLAN <br />Product: Documentation and evaluation of landside facility requirements for input to later tasks. <br />Task 5.6 - Develop Facility Requirements Working Paper <br />The Consultant will develop a detailed working paper describing the tasks outlined above. The draft <br />working paper will provide Information for subsequent decisions. This working paper will be submitted <br />to Kittitas County and the Federal Aviation Administration for review and comment approximately two <br />weeks prior to scheduled meetings (See Element 15 for document distribution details). The draft <br />working paper will be distributed to the planning advisory committee at least one week prior to a <br />scheduled meeting. <br />Product: A narrative and graphical summary of the facility requirements analysis; the working paper will <br />be revised as necessary based on review comments and will become a chapter of the Airport Master Plan <br />report. <br />ELEMENT 6 - SUMMARY OF ENVIRONMENTAL STATUS <br />The Consultant will evaluate the status of known environmental issues during the initial stages of data <br />collection (Element 3). This information will be incorporated into subsequent facility requirements, <br />alternatives, and land use analyses. The impacts of storm drainage, water quality and potential wetland <br />impacts will be addressed as part of the evaluation of existing conditions and any future expansion <br />options. <br />Task 6.1- Environmental Conditions inventory <br />5. 1.1- Part 1— EXIsting C nd lt€on <br />Utilizing existing maps of the airport environs and existing environmental documents, the Consultant <br />will prepare an environmental Inventory/overview of the Airport's environmental setting and operating <br />environment. No formal coordination with federal and state agencies will be conducted as part of this <br />work element. Informal coordination may occur during the process of obtaining existing documents, <br />etc. from various agencies. <br />This task does not include analysis or other scientific evaluation of resources. This summary is intended <br />to reference any known or potential environmental conditions or issues that could be affected by <br />proposed airport development that have been Identified in recent environmental efforts conducted on <br />the airfield. <br />Gather and review studies and secondary source data concerning area environmental factors related to <br />airport development. Information gathered will Include information on: <br />CENTURY Ks <br />LAY { :U <br />Pap 121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.