Laserfiche WebLink
Kittitas County Transfer Station <br /> April 2018 Community Meeting Summary <br /> <br />Updated 5/31/2018 <br />2 <br /> <br />Tools <br />• A Participate Online project website has been available with content from the first <br />round of outreach since May 2017. The website was updated in advance of the meeting <br />with details of the upcoming meeting, including when and where it would be held and <br />what information would be shared. The website was updated again on the day of the <br />meeting to include all meeting materials (such as the display boards and the PowerPoint <br />presentation shown at the meeting) and provide interested community members an <br />opportunity to review the project information when it was convenient for them. The <br />feedback survey from the community meeting was also posted on the Participate Online <br />site, allowing site visitors to provide their feedback. The project team accepted feedback <br />on the content presented at the April community meeting through April 27, 2018 <br />(Appendix F). <br /> <br />PowerPoint Presentation <br />• A PowerPoint presentation given at the April meeting provided project updates, a <br />summary of what has been completed to date, frequently heard questions and concerns <br />regarding the site selection process, and next steps (available online). <br /> <br />Display Boards <br />• Display boards provided detailed information on the following (available online and in <br />Appendix G): <br />o The project overview and purpose* <br />o Preliminary siting criteria* <br />o Final siting criteria* <br />o Site screening process* <br />o Cement plant site location* <br />o Cement plant site potential layout* <br />o Tjossem Road site location* <br />o Tjossem Road site potential layout* <br />o US 97/Old Highway 10 location <br />o US 97/Old Highway 10 site layout <br />o Comparative costs <br />o Public involvement opportunities* <br />o Siting process and anticipated schedule* <br />o Frequently asked questions <br /> <br />*These boards were originally produced for the June 2017 and September 2017 community meetings. <br /> <br />Handouts <br />• An FAQ was produced to respond to common questions and concerns the project team <br />has heard so far and to inform further feedback (Appendix H). <br />• Printed surveys were provided as an opportunity for the public to provide their <br />feedback on the three potential sites and the secondary siting criteria (see feedback <br />summary below) (Appendix I). <br />