My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2018-122 PSA CenturyWest
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
Res-2018-122 PSA CenturyWest
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2018 10:03:19 AM
Creation date
8/15/2018 10:01:24 AM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution to Authorize the Board of County Commissioners Signature on a Professional Services Agreement with Century West for Bowers Field Environmental Services
Order
22
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A2 AFFIRMATIVE ACTION REQUIREMENT <br />A2.l SOURCE <br />41 CFR part 60-4 <br />Executive Order 11246 <br />A2.2 APPLICABILITY <br />Minority Participation. Sponsors are required to set goals for minority participation in AIP funded <br />projects exceeding $10,000. The goals for minority participation derive from Economic Area (EA) and <br />Standard Metropolitan Statistical Area (SMSA) as established in Volume 45 of the Federal Register dated <br />10/3/80. Page 65984 contains a table of all EAs and SMSAs and the associated minority participation <br />goals. <br />To find the goals for minority participation, a sponsor must either refer to the Federal Register Notice or <br />to the Department of Labor online document, "Participation Goals for Minorities and Fema les ". EAs and <br />SMSAs span state boundaries. A sponsor may have to refer to entries for adjacent states in order to <br />locate the goal for the project location. <br />Female Participation. Executive Order 11246 has set a goal of 6.9% nationally for female participation <br />for all construction projects. This value remains constant for all counties and states. <br />Contract Types - <br />Construction -The sponsor must incorporate this notice in all solicitations for bids or requests <br />for proposals for AIP funded construction work contracts and subcontracts that exceed $10,000. <br />Construction work means construction, rehabilitation, alteration, conversion, extension, <br />demolition or repair of buildings, highways or other changes or improvements to real property, <br />including facilities providing utility services. The term also includes the supervision, inspection <br />and other onsite functions incidental to the actual construction. <br />Equipment-The sponsor must incorporate this notice in any equipment project exceeding <br />$10,000 that involves installation of equipment onsite (e.g. electrical vault equipment). This <br />provision does not apply to equipment acquisition projects where the manufacture of the <br />equipment takes place offsite at a manufacturer's plant (e .g. firefighting and snow removal <br />vehicles). <br />Professional Services -The sponsor must incorporate this notice in any professional service <br />agreement if the professional services agreement includes tasks that meet the definition of <br />construction work [as defined by the U.S. Department of Labor (DOL)] and exceeds $10,000. <br />Examples include installation of monitoring systems (e.g. noise, environmental, etc.). <br />Guidelines for Contract Provisions for Obligated Sponsors and Airport Improvement Program Projects <br />Issued on December 12, 2017 Page 2
The URL can be used to link to this page
Your browser does not support the video tag.