Laserfiche WebLink
<br />Professional Services Agreement (rev. 02/26/2017) <br />Page 13 of 17 <br /> <br /> EXHIBIT "A" <br /> <br /> SCOPE OF WORK <br /> <br />In addition to providing all material and labor, the Contractor shall perform the following: <br /> <br />Contractor can start work October 1, 2018 and all work must be completed by <br />December 21, 2018. <br /> <br />Contactor is to crush designated concrete pile located at the Kittitas County Ryegrass <br />Landfill to a non-spec 1½” minus product removing as much metal as possible material <br />approved by Kittitas County for use to cover cells and build roads. <br /> <br />For an additional fee Contractor will prep all oversize material larger than 2’X2’ to and <br />acceptable size so it can be crushed to the non-spec 1½” minus product. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />