Laserfiche WebLink
WATERSHED <br />�� Sl'IFfVCL: 8 F.ISCi11VFFRii�G <br />110 Prefontaine Place South, Suite BOB <br />Seattle, WA SB104 <br />Tel. (206) 521-3000 <br />Estimate of Professional Services <br />Prepared for: Khfts County <br />Project: AirportAnalysis <br />Flood Reduction Alternatives <br />Date: April 27, 2018 <br />Prepared By: Chris Frei <br />TASK DESCRIPTION <br />Prin <br />Sr. Eng. I <br />Hours <br />Sr. Eng. II Sr. Salon. <br />Jr. Eng. tGIS Bpeciali <br />Gontract Admin <br />Totals <br />1. Date Collection and Review <br />4 <br />H <br />$1,340 <br />2. Review of Existing Storm Drainage System <br />2 <br />a , <br />$1 050 <br />3. Fie:d Reconnaissance and Survey Coordination <br />12 <br />12 <br />$2,880 <br />4. Hydrology <br />2 <br />4 <br />6 <br />$1740 <br />5. Hydraulic Modeling of Existing Conditions <br />2 <br />2 <br />8 <br />24 <br />$4,190 <br />S. Identlffcatlon and Modeling of Flood Reduction Concepts <br />4 <br />18 1 <br />40 <br />$6,920 <br />7. Selection of a preferred Alternative and Additional effnements <br />2 <br />8 <br />20 <br />UAW <br />r <br />8. Study Report <br />6 <br />10 <br />16 <br />$5.440 <br />9. Administration <br />1 <br />4 <br />21 <br />$900 <br />Total Hours and Direct Labor Cost (DL) <br />Labor Rate ($fhr) <br />TOTAL LABOR COST <br />19.0 <br />$200.00 <br />$3,600 <br />2.0-1-74.0 <br />$175.00 1 <br />$350 <br />0.0 <br />$145.00 1 $130.00 1 <br />$10,730 $0 <br />I <br />130.0 0.0 1 <br />$95.00 1 $75.00 <br />$12,920 $0 <br />2.0 <br />$60.00 <br />$120$27,920 <br />Direct Expense Detail <br />Units Rate Cost <br />Travel to Project Site 500 $0.540 $270.00 <br />Reproduction and Communication $50.00 <br />Gage Materials $250.00 <br />Total $570.00 <br />Cost Summary <br />Total Labor $27,920 <br />Total Direct Expenses $570 <br />Total $28,490 <br />