My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoAuthorizeProfessionalServicesAgmtforEAatBowersField
>
Meetings
>
2018
>
08. August
>
2018-08-07 10:00 AM - Commissioners' Agenda
>
ResolutiontoAuthorizeProfessionalServicesAgmtforEAatBowersField
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 12:47:39 PM
Creation date
8/2/2018 12:44:41 PM
Metadata
Fields
Template:
Meeting
Date
8/7/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
v
Item
Request to Approve a Resolution to Authorize the Board of County Commissioners Signature on a Professional Services Agreement with Century West for Bowers Field Environmental Services
Order
22
Placement
Consent Agenda
Row ID
47023
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATERSHED <br />�� Sl'IFfVCL: 8 F.ISCi11VFFRii�G <br />110 Prefontaine Place South, Suite BOB <br />Seattle, WA SB104 <br />Tel. (206) 521-3000 <br />Estimate of Professional Services <br />Prepared for: Khfts County <br />Project: AirportAnalysis <br />Flood Reduction Alternatives <br />Date: April 27, 2018 <br />Prepared By: Chris Frei <br />TASK DESCRIPTION <br />Prin <br />Sr. Eng. I <br />Hours <br />Sr. Eng. II Sr. Salon. <br />Jr. Eng. tGIS Bpeciali <br />Gontract Admin <br />Totals <br />1. Date Collection and Review <br />4 <br />H <br />$1,340 <br />2. Review of Existing Storm Drainage System <br />2 <br />a , <br />$1 050 <br />3. Fie:d Reconnaissance and Survey Coordination <br />12 <br />12 <br />$2,880 <br />4. Hydrology <br />2 <br />4 <br />6 <br />$1740 <br />5. Hydraulic Modeling of Existing Conditions <br />2 <br />2 <br />8 <br />24 <br />$4,190 <br />S. Identlffcatlon and Modeling of Flood Reduction Concepts <br />4 <br />18 1 <br />40 <br />$6,920 <br />7. Selection of a preferred Alternative and Additional effnements <br />2 <br />8 <br />20 <br />UAW <br />r <br />8. Study Report <br />6 <br />10 <br />16 <br />$5.440 <br />9. Administration <br />1 <br />4 <br />21 <br />$900 <br />Total Hours and Direct Labor Cost (DL) <br />Labor Rate ($fhr) <br />TOTAL LABOR COST <br />19.0 <br />$200.00 <br />$3,600 <br />2.0-1-74.0 <br />$175.00 1 <br />$350 <br />0.0 <br />$145.00 1 $130.00 1 <br />$10,730 $0 <br />I <br />130.0 0.0 1 <br />$95.00 1 $75.00 <br />$12,920 $0 <br />2.0 <br />$60.00 <br />$120$27,920 <br />Direct Expense Detail <br />Units Rate Cost <br />Travel to Project Site 500 $0.540 $270.00 <br />Reproduction and Communication $50.00 <br />Gage Materials $250.00 <br />Total $570.00 <br />Cost Summary <br />Total Labor $27,920 <br />Total Direct Expenses $570 <br />Total $28,490 <br />
The URL can be used to link to this page
Your browser does not support the video tag.