Laserfiche WebLink
can be permitted. The owner shall submit a land use application, the associated $250 <br />application fee, and acquire a Land Use Agreement from BPA in addition to the <br />County's building permit for any portion of the owner's development plans that lie <br />within BP A's right-of-way. <br />31.4 Water <br />31.4.1 Marian Meadows/Easton Water District shall confirm an intended connection to the <br />Easton Water District, and then submit estimated water usage quantities, so that DOH <br />can determine whether the precise number of new connections that are proposed for <br />Marian Meadows can be served by the existing system, or apply for a new Group A <br />Community public water system with the DOH Office of Drinking Water. <br />31.4.2 Marian Meadows shall identify how wastewater will be managed . <br />31.4.3 The Applicant shall submit documentation and engineering design for proposed water <br />extension to DOH for the review and approval. <br />32) V is ual OuaHt y, Light and Glare <br />As described in the FEIS, visual impacts can be mitigated through the following methods, and such <br />methods are conditions of approval: <br />32.1 Road cuts shall be revegetated with native coniferous trees. <br />32.2 Outdoor lighting shall be shielded and directed downward. <br />33) Noise <br />Noise impacts are discussed on pg. 3-227 of the FEIS. <br />33.1 When possible, construction activities shall be limited to daylight hours. <br />33.2 KCC 9.45.040 exempts construction from noise ordinances between the hours of6:00 am and <br />10:00 pm. Should circumstances require work outside of these hours, the applicant shall apply <br />for a variance with the Board of County Commissioners pursuant to KCC 9.45.070. <br />34) Air Quali ty <br />34.1 The project shall comply with all applicable local, state and federal laws regulating air quality. <br />34.2 Current quarry work will impact air quality. Quarry operations will be amended as the <br />development moves north. Quarry operations will continue and provide resource materials <br />needed for the development. Once residential vertical build out is within 250' if quarry <br />operations, operations will cease and reclamation will commence. <br />30