30.2.5 The FEIS identified additional equipment to mitigate Fire and Medical Response <br />impacts associated with the project. Project contribution to these measures is identified <br />in the FEIS. Such contributions can be made a condition of a Development Agreement, <br />with amounts identified appropriate to the 89 unit current proposal. The applicant shall <br />contact the Kittitas County Fire District #3 to determine appropriate mitigation <br />measures. Mitigation measures shall be included in the development agreement. <br />30.3 Schools <br />31) Utilities <br />The FEIS examines impacts to the Easton School District. Impacts of the current proposal are <br />most similar to those identified in Alternatives 3D and 5. The FEIS suggests project <br />contribution to increased District costs. Such contributions can be made a condition of a <br />Development Agreement. The applicant shall contact Easton School District and develop <br />mitigation measures. Mitigation measures shall be included in the development agreement. <br />31 .1 Sewer <br />31.1.1 Residential lots will be served by an On-site septic system. <br />31.1.2 The RV Complex shall be served with a Large On-Site Septic System designed to DOH <br />standards with oversight by DOH /Satellite Management. <br />31.1.3 Prior to any development on the steeper eastern slopes, a sewage disposal master plan <br />shall be submitted to Kittitas County Environmental Health. <br />31.2 Stormwntcr Management <br />31.2.1 Stormwater plans submitted to CDS shall depict design standards showing pervious <br />construction methods with a focus on retention and infiltration. <br />31.2.2 Development shall comply with the Ecology Stormwater Management module Eastern <br />Washington. <br />31.3 Electric Utilities <br />31.3 .1 The plat map shall include the following note: <br />"The Bonneville Power Administration imposed certain conditions on the portions of <br />these lots encumbered by its high voltage transmission line right-of-way. BPA does not <br />allow structures to be built within the right-of-way, nor does it allow access to be <br />blocked to any transmission facilities. Any activity that is to occur within the right-of <br />way may be addressed to BPA real Estate Field Services at (877) 417-9454". <br />31.3.2 BPA shall be allowed the opportunity to review the location of proposed roads, use of <br />existing access roads, snow storage, utilities, etc. to ascertain whether or not the uses <br />29