Laserfiche WebLink
• Coordination with COUNTY staff and CONSULTANT team. <br />• Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />• DELIVERABLES <br />• STRUCTURES <br />• One (1) Preliminary Evaluation of a four-sided precast concrete box culvert <br />• Preliminary culvert plans (plan, elevation, & typical section) of four-sided <br />precast concrete box culvert. <br />• ROADWAY <br />• One (1) Draft Basis of Design Memo <br />• One (1) 30% plan set. <br />TASK 10.2 -Lick Creek <br />• Added Scope : <br />• ENVIRONMENTAL <br />• Create 0-30% mitigation/restoration plan set using a landscape architect stamped <br />channel grading, habitat features, and revegetation plan sheets. <br />• HYDRAULICS <br />• Develop the creek typical section and horizontal alignment <br />• STRUCTURES <br />• Evaluate Preliminary Concepts of a pre manufactured culvert directly with the COUNTY. <br />As a result of this Preliminary Evaluation, the manufactured culvert will be evaluated <br />with regard to the proposed length, width, orientation, and cost as pertains to: <br />• Site hydraulics and scour conditions <br />• Site preliminary geotechnical information <br />• ROADWAY <br />• Develop a preliminary Basis of Design Memo including project criteria, existing and <br />proposed geometrics, project constraints, design speed, clear zone, design elements, <br />design variances, design decisions, environmental permits, right-of-way, hydraulics, <br />maintenance of traffic (MOT), maintenance concerns, and any outstanding issues to be <br />resolved. Some of these elements may not be applicable for this project. <br />• Layout and evaluate up to three (3) horizontal and vertical MOT alignments to <br />accommodate the proposed culvert replacement. <br />• Develop the overall model of the project site including the proposed creek corridor. <br />• Develop 30% plan set with existing and proposed horizontal and vertical alignments for <br />roadway centerline and preferred MOT centerline, and right-of-way impacts (if any). <br />• Coordination with COUNTY staff and CONSULTANT team. <br />• Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />Scope of Service_Teanaway Hyd lmp_Amend 01_2018-04-19 <br />Page 8 of 19