6.3 . If scour/bank projection measures are needed, continued coordination with the <br />COUNTY will occur to develop design concepts. <br />7. Lick Creek Channel Design <br />7.1. Design a channel that will restore natural stream processes to the extent practicable <br />given project constraints (e.g . ROW, existing flooding of residents, project costs, etc). <br />The design will focus on creating a sustainable creek cross section, profile and <br />alignment which will aim to reduce existing flooding of private residences while <br />providing suitable habitat for aquatic organisms. <br />8. Scour Analysis <br />8.1. Depth of scour estimates will be computed for the proposed Teanaway Road water <br />crossing and up to two (2) residential/private property water crossings. These <br />estimates will be provided for consideration in design of the proposed water crossing <br />structures. <br />9. Team Meetings & Permitting Assistance <br />9.1. Attend up to 2 meetings at the project site or the County Public Works Office <br />9.2. Participate in bi-weekly (or as needed less frequently) team meetings via conference <br />call. <br />9.3. Assist with the team's preparation of permit applications and answer questions that <br />arise during agency review. <br />10. Documentation <br />10.1. Develop a Preliminary Basis of Design Memo and Final Basis of Design Report to <br />summarize the results of the hydraulic and scour assessment. The report will include a <br />description of the physical characteristics of the site, including photographs taken <br />during the site reconnaissance, text, tables, and figures that describe the results of the <br />hydrologic, geomorphic, hydraulic, and scour analyses. <br />11. DELIVERABLES <br />11.1. One (1) Preliminary Basis of Design Memo <br />11 .2. One (1) Final Basis of Design Report <br />TASK 8 RIGHT-Of-WAY EASEMENT/ACQUISITION <br />1. Storey Creek <br />1.1. Review COUNTY-provided documents to assess easement/acquisition need(s). <br />1.2. Prepare one (1) Site Inspection Report. <br />1.3. Review report and title exceptions (1 parcel). <br />1.4. Identify fee interest ownership (1 parcel). <br />1.5. Prepare a Project Funding Estimate and prepare one (1) AOS worksheet . <br />1.6. Prepare and set up acquisition file: TCE or Easement (1 parcel). <br />1.7 . Conduct negotiations for the purchase of a temporary construction easement in <br />accordance with the COUNTY's approved Right-of-Way Procedures, federal & state