My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2017-145
>
Meetings
>
2017
>
09. September
>
2017-09-05 10:00 AM - Commissioners' Agenda
>
Res-2017-145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:21:34 PM
Creation date
6/13/2018 12:21:09 PM
Metadata
Fields
Template:
Meeting
Date
9/5/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
n
Item
Request to Approve a Resolution Authorizing the Chair's Signature for Policy on Right of Way Acquisition Procedures, Personnel Qualifications, Waiver of Appraisal and Administrative Settlement Procedures
Order
14
Placement
Consent Agenda
Row ID
39161
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Right of Way Procedures <br />The Kittitas County, hereinafter referred to as "AGENCY", desiring to acquire real property (obtain an interest <br />in, and possession of, real property) in accordance with the Uniform Relocation Assistance and Real Property <br />Acquisition Policies Act and applicable federal regulations (49 CFR Part 24) and state law (Ch. 8.26 RCW), and <br />state regulations (Ch. 468-100 WAC) hereby adopts the following procedures to implement the above statutes <br />and Washington Administrative Code . The AGENCY is responsible for the real property acquisition and <br />relocation activities on projects administered by the AGENCY. To fulfill the above requirements the AGENCY <br />will acquire right-of-way (ROW) in accordance with the policies set forth in the Right of Way Manual M 26-01 <br />and Local Agency Guidelines. The AGENCY has the following expertise and personnel capabilities to accomplish <br />these functions: <br />1. The following relate to the AGENCY's request. <br />a. Below is a list of responsible AGENCY individual names and positions, for which the AGENCY has <br />qualified staff to perform the specific right-of-way function(s). Attached are resumes for each <br />individual AGENCY staff listed to perform those functions below, and a brief summary of their <br />qualifications pertaining to the specific ROW function(s) for which they are listed. The procedures <br />shall be updated whenever staffing changes occur. The AGENCY will be approved to acquire based <br />upon staff qualifications. <br />i. PROGRAM ADMINISTRATION: <br />Oversee delivery of the R/W Program on federal aid projects for the agency. Ensures R/W <br />functions are carried out in compliance with federal and state laws, regulations, policies and <br />procedures. <br />Responsibilities/Expectations: <br />• Ensures agency's approved R/W Procedures are current, including staff qualifications, and <br />provides copies to consultants and agency staff; <br />• Oversight of ROW consultants; <br />o use of consultant contract approved by WSDOT (under construction) <br />o management of ROW contracts <br />o management of ROW files <br />o reviews and approves actions and decisions recommended by consultants <br />o Overall responsibility for decisions that are outside the purview of consultant functions <br />• Sets Just Compensation prior to offers being made; <br />• Approves administrative offer summaries per policy; <br />• Ensure agency has a relocation appeal process in place prior to starting relocation activities; <br />• Oversight of Administrative Settlements; <br />• Obligation authority for their agency; <br />• Obtain permits {Non-Uniform Relocation Act (URA)); <br />• Ensures there is a separation of functions to avoid conflicts of interest. <br />• Verifies whether or not ROW is needed, and that the property rights and/or interests needed <br />are sufficient to construct, operate and maintain the proposed projects (see Appendix 25.176). <br />Mark Cook , PE, Public Works Director; Lucas Huck, PE, County Engineer; Sara Folk, PE, Construction Manager <br />(Insert Name and Title of AGENCY Position above & attach resume of qualifications) <br />LPA-001 Right of Way Procedures <br />Revised 1012016 Sf In Jr('T TO REQUIREMENTS LISTED IN <br />RIGH r U.' 'Yt,,¥, 1-'l<.UCEDURES APPROVAL LETTER <br />Page 10f4
The URL can be used to link to this page
Your browser does not support the video tag.