Laserfiche WebLink
Develop and evaluate alternatives as required for the rerouting and/or relocation of the <br />existing storm facilities in the project area. Evaluate onsite facilities for storm water <br />collection and treatment for the facility. Estimate ROM costs. <br />Task6-Gas <br />6.1 Research -Research existing gas facilities within the project limits and/or effected by <br />the new facility. Develop and evaluate alternatives as required for the rerouting and/or <br />relocation of the gas facilities in the project area. Estimate ROM costs. <br />Task 7 -Electricity <br />7.1 Research -Research existing power lines and routing within the project limits . <br />Task 8 -Summary Report <br />8.1 Summary Report -Develop a summary Report with estimated ROM engineering and <br />construction costs. <br />Deliverables <br />1. Summary Report. <br />Our fee for the above noted services is not to exceed $9,000.00 plus a reimbursable expense <br />allowance of $500.00. <br />20f2