My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 1
>
Meetings
>
2017
>
05. May
>
2017-05-16 10:00 AM - Commissioners' Agenda
>
Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 12:02:27 PM
Creation date
6/13/2018 12:01:27 PM
Metadata
Fields
Template:
Meeting
Date
5/16/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
d
Item
Request to Approve Change Order No. 1 for the Courthouse Feasibility Study and Predesign
Order
4
Placement
Consent Agenda
Row ID
36691
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1\ <br />Erlandsen <br />SURVEYING I PLANNING I ENGINEERING I GIS <br />250 Simon Street SE <br />East Wenatchee. WA 98802 <br />Phone: 509.884.2562 <br />fax: 509.884.2814 <br />www.erlandsen.com <br />Kittitas County Courthouse Project -Feasibility Study <br />Architects Rasmussen Triebelhorn are working with Kittitas County on the planing of a new <br />courthouse facility. The new facility will be located on the west half of the block north of the <br />existing jail to West 7th Avenue. Demolition of the existing courthouse with the resultant area <br />being used for additional on-site parking. The following Scope of Services is based upon our <br />understanding of the engineering services required to complete the study. The study will evaluate <br />the existing utilities (water, sewer, storm water, electricity, gas and telecommunications), <br />vehicular, bicycle and pedestrian facilities within and abutting the project site. The following <br />summarizes the Proposed Scope of Services: <br />Task 1-Meetings and Project Management <br />1.1 Project Meetings -One project team meeting in Tacoma. <br />1.2 Project Management -Manage and review project civil engineering elements. <br />Task 2 -Site Layout <br />2.1 Site Layout -Collaborate on architect prepared conceptual alternatives for vehicular, <br />bicycle and pedestrian traffic/facilities within and abutting the project limits. <br />Task 3 -Water <br />3.1 Research -Research existing water mains and services (age, size and conditions) within <br />and/or effected by the new facility. Develop and evaluate alternatives as required for the <br />rerouting and/or relocation of the existing water mains and services in the project area. <br />Service(s) to the new facility. Estimate ROM costs. <br />Task 4 -Sewer <br />4.1 Research -Research existing sewer mains and side services (age, size and conditions) <br />within the project limits and/or effected by the new facility. Develop and evaluate <br />alternatives as required for the rerouting and/or relocation of the existing sewer mains <br />and connecting services in the project area. Connecting service(s) to the new facility. <br />Estimate ROM costs. <br />Task 5 -Storm Water <br />5.1 Research -Research existing storm water facilities, structures and conveyance systems <br />(age, size and conditions) within the project limits and/or effected by the new facility.
The URL can be used to link to this page
Your browser does not support the video tag.