My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2016-144
>
Meetings
>
2016
>
11. November
>
2016-11-01 10:00 AM - Commissioners' Agenda
>
Res-2016-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:53:09 AM
Creation date
6/13/2018 11:48:58 AM
Metadata
Fields
Template:
Meeting
Date
11/1/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Approve a Resolution for the 2017 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Cle Elum
Order
10
Placement
Consent Agenda
Row ID
32766
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NARRATIVE <br />1. Project Description: Describe the scope of work. Indicate the major work Involved, including a brief <br />comparison of existing and proposed conditions. <br />rrhis project will involve assessing the current condition of the City ofCle Elum's stormwater <br />!conveyance system and facilities in the project area shown. It will also require collecting <br />inventory of the existing system by surveying methods. The major portion of the project <br />Fonsists of designing a comprehensive stonnwater system plan to a level that is shovel ready <br />!for construction within approximately 20 18(subject to funding). Currently the City lacks a <br />significant amount of stormwater facilities, such as catch basins, main trunk lines & snow <br />storage areas. This project would allow us to address these issues. <br />2. Explain the speclflc Infrastructure Issues the project addresses and how they are linked to economic <br />development Improvements. <br />This project will design facilities to eliminate storm water complaints and concerns by residents <br />and. businesses, safety, and infiltration/inflow. Infiltration/inflow causes dilution in sanitary <br />sewers. Dilution of sewage decreases the efficiency of treatment, and may cause sewage <br />~olumes to exceed design capacity. City of Cle Elum has been given a verbal notice from the <br />Department of Ecology that their current 111 is above allowed levels. This project would help <br />satisfY DOE's concerns by showing progress in addressing this issue, while also showing <br />businesses and the community that necessary improvement are being made. <br />3. Preliminary Engineering Phase: <br />Estimated Start Date: January 1,2017 Estimated End Date: August 1,2017 <br />Please explain phase status (work already completed, in progress, awaiting funding, etc., and factors that <br />may slow phase progress). <br />. . <br />Currently the Cle Blum Downtown Association is working on a conceptual main st. <br />. l'evitaUzation plan and this project would take it one step further by including the City as a <br />Whole. This portion of the project is awaiting funding which is the only factor holding up <br />~rogress . <br />4. Right of Way Phase: NI A <br />Estimated Start Date: NI A <br />Is It Required? Yes ___ No _X __ <br />N/A estimated End Date: _-_______ _ ------- <br />Please explain phase status (work already completed, In progress, awaiting funding, etc., and factors that <br />may slow phase progress). <br />All design work ;s anticipated to be within puhlic right-af-way limits. <br />11
The URL can be used to link to this page
Your browser does not support the video tag.