Laserfiche WebLink
SARGENT SEI #A11178.26 File: Estimate in Piece_6_23_14,xlsx <br />Sa'90f1i Eng;noets I",. <br />32D Ronl"" lane IWI <br />O~mp," IVA 98502 <br />1t! 3w-601""M <br />Project: Westside Road Date: 6/23/2014 <br />ITEM <br />NO. <br />6373 <br />6403 <br />6416 <br />6490 <br />6748 <br />6711 <br />6717 <br />6719 <br />6760 <br />6771 <br />6806 <br />6971 <br />7006 <br />7008 <br />7014 <br />7037 <br />7038 <br />7490 <br />7550 <br />7736 <br />Designed By: MJS Page 2 <br />CONSTRUCTION COST ESTIMATE <br />209+00 to 229+00 <br />ITEM DESCRIPTION UNIT UNIT COST aTY COST <br />EROSION CONTROL AND ROADSIDE PLANTING <br />SILT FENCE L.F. $ 3.00 2910 $8,730 <br />ESC LEAD DAY $ 100.00 3 $348 <br />SEEDING, FERTILIZING, AND MULCHING L.S. $ 1.00 1 $828 <br />EROSIONIWATER POLLUTION CONTROL EST. $ 2,000.00 1 $2,000 <br />TRAFFIC <br />BEAM GUARDRAIL TYPE 1 -8 FT. LONG POST L.F. $ 25.00 0 $0 <br />BEAM GUARDRAIL TYPE 31-8 FT. LONG POST L.F. $ 25.00 838 $20,950 <br />BEAM GUARDRAIL NON-FLARED TERMINAL EACH $ 3,000.00 0 $0 <br />BEAM GUARDRAIL TYPE 31 NON-FLARED TERMINA EACH $ 2,500.00 6 $15,000 <br />BEAM GUARDRAIL TRANSITION SECTION TYPE 22 EACH $ 3,000.00 0 $0 <br />BEAM GUARDRAIL ANCHOR TYPE 1 EACH $ 1,000.00 0 $0 <br />PAINT LINE L.F. $ 0.20 6000 $1,200 <br />PROJECT TEMPORARY TRAFFIC CONTROL L.S . $ 1.00 1 $8 ,522 <br />OTHER <br />STRUCTURE EXCAVATION CLASS B INCL. HAUL C.Y. $ 12 .00 24 $288 <br />SHORING OR EXTRA EXCAVATION CLASS B S.F. $ 7.00 326 $2,282 <br />GRAVEL BACKFILL FOR DRAIN C.Y. $ 40.00 18 $720 <br />STRUCTURE SURVEYING L.S. $ 500.00 1 $500 <br />ROADWAY SURVEYING L.S. $ 1,500.00 1 $1,500 <br />TRIMMING AND CLEANUP L.S. $ 1,500.00 1 $1,500 <br />CONSTRUCTION GEOTEXTILE FOR UNDERGROUN[ S.Y. $ 2.00 92 $184 <br />SPCC PLAN L.S. $ 400.00 1 $400 <br />SUBTOTAL $161 ,109 <br />ITINGENCIES $16,111 <br />TOTAL $177,219 <br />-l' \ gS,otJO c,..OuNItJ) <br />-+ If, 000_ c.€" <br />-t ).../3} or;o