My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res-2016-081
>
Meetings
>
2016
>
06. June
>
2016-06-21 10:00 AM - Commissioners' Agenda
>
Res-2016-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 11:46:10 AM
Creation date
6/13/2018 11:42:56 AM
Metadata
Fields
Template:
Meeting
Date
6/21/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
l
Item
Request to Approve a Resolution to Amend the 2014 Grant Application for Westside and Huntzinger Roads HSIP Project and Authorize the Signature of the County Road Engineer on the Amended Grant Application
Order
12
Placement
Consent Agenda
Row ID
30235
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Y\ (' ~."3 ~ HIS <br />S\-o.-tlCf) ;2.<.~)q + DC, -tc 2."2-"~ t-0 0 <br />SARGENT SEI #Al1178.26 File: Estimate in Piece_6_23_14.xlsx <br />SJrgonl Eng_IS In:: <br />320 Ronl .. u.n. NI'/ <br />0 :1'"1"0, WI. 98$O? <br />Ttl 3&0-&37-9264 <br />Project: Westside Road Date: 6/23/2014 <br />Designed By: MJS Page 1 <br />CONSTRUCTION COST ESTIMATE <br />209+00 to 229+00 <br />ITEM ITEM DESCRIPTION UNIT UNIT COST QTY COST NO. <br />PREPARATION <br />0001 MOBILIZATION L.S. $ 1.00 1 $1 4,646 <br />0035 CLEARING AND GRUBBING L.S. $ 1.00 1 $1,361 <br />0049 REMOVING DRAINAGE STRUCTURE EACH $ 1,000 .00 0 $0 <br />0187 REMOVING PAINT LINE L.F. $ 1.00 2000 $2,000 <br />GRADING <br />0310 ROADWAY EXCAVATION INCL. HAUL C.Y. $ 10.00 269 $2,691 <br />0431 GRAVEL BORROW INCL. HAUL TON $ 10.00 168 $1,681 <br />0470 EMBANKMENT COMPACTION C.Y. $ 2.50 83 $207 <br />DRAINAGE <br />1160 UNDERDRAIN PIPE 6 IN. DIAM. L.F. $ 11.00 160 $1,760 <br />1163 UNDERDRAIN PIPE 12 IN. DIAM, L.F. $ 45.00 176 $7,920 <br />1164 UNDERDRAIN PIPE 151N. DIAM. L.F. $ 50.00 0 $0 <br />1165 UNDERDRAIN PIPE 181N. DIAM , L.F. $ 50.00 0 $0 <br />STORM SEWER <br />3091 CATCH BASIN TYPE 1 EACH $ 1,500 .00 0 $0 <br />3541 SCHEDULE A STORM SEWER PIPE 121N. DIAM . L.F. $ 45.00 0 $0 <br />3542 SCHEDULE A STORM SEWER PIPE 18 IN . DIAM . L.F . $ 50.00 0 $0 <br />STRUCTURE <br />4006 STRUCTURE EXCAVATION CLASS A INCL. HAUL C.Y . $ 15 .00 126 $1,890 <br />4013 SHORING OR EXTRA EXCAVATION CL. A L.S. $ 1.00 1 $11,280 <br />4025 GRAVEL BACKFILL FOR WALL C.Y . $ 40 .00 59 $2,360 <br />4410 BRIDGE RAILING TYPE THRIE BEAM L.F. $ 300 .00 0 $0 <br />RETAINING WALL L.S. $ 1.00 1 $22,600 <br />SURFACING <br />5100 CRUSHED SURFACING BASE COURSE TON $ 17,00 278 $4,72 9 <br />5120 CRUSHED SURFACING TOP COURSE TON $ 25,00 139 $3,477 <br />HOT MIXED ASPHALT <br />5767 HMA CL. 1/2 IN . PG 64-28 TON $ 80.00 167 $13,354 <br />5830 JOB MIX COMPLIANCE PRICE ADJUSTMENT CALC $ 1,200 .00 1 $1,200 <br />5835 COMPACTION PRICE ADJUSTMENT CALC $ 1,500.00 1 $1,500 <br />5837 ASP HAL T COST PRICE ADJUSTMENT CALC $ 1,500 .00 1 $1,500
The URL can be used to link to this page
Your browser does not support the video tag.