Laserfiche WebLink
ST-22 - E WASHINGTON AVE <br />Schedule: 2021 <br />Estimated Cost: $50,000 <br />This project would include Widening & Resurfacing from N pt St to N A St (340 ft) <br />ST-23 - E WASHINGTON AVE <br />Schedule: 2021 <br />Estimated Cost: $57,000 <br />This project would include Resurfacing from N C St to NESt (375 ft) <br />ST-24 - W ARIZONA AVE <br />Schedule: 2021 <br />Estimated Cost: $55,000 <br />This project would include Reconstruction & Resurfacing from N 6th St to the end (300 ft) <br />ST-25 - E WASHINGTON AVE <br />Schedule: 2021 <br />Estimated Cost: $60,480 <br />This project would include Reconstruction from N 2nd St to N 3 rd St (300 ft) <br />SIDEWAlKS PLAN <br />Sidewalks in Roslyn are the responsibility ofthe abutting property owner to maintain and replace. <br />In 1995 Roslyn completed a downtown sidewalk project to replace and repair the commercial <br />core sidewalks. The property owners bore the cost except for the removal and disposal of the <br />old walks, which the City took responsibility for. Sidewalks are inspected each spring and notes <br />are kept to the condition. Where necessary, sidewalks are posted with "watch your step" signs. <br />In 1999 the City received grant monies from the State Department of Transportation to replace <br />sidewalks on the south side of State Route 903 from Dakota Avenue to Colorado Avenue, and <br />from Washington Alley to Idaho Avenue. This work was done at no cost to the property owner, <br />and the City was required to pay five percent of the total costs. Work was finished in the spring <br />of 2000. <br />CAPITAL IMPROVEMENT PROJECTS: <br />51-1-4TH STREET REPLACEMENT <br />Schedule: 2018 <br />Estimated Cost: $200,000 <br />51-2 - 5 <br />TH STREET REPLACEMENT & REPAIR <br />Schedule: 2018 <br />Estimated Cost: $250,000 <br />51-3 -2ND STREET REPLACEMENT <br />June 15,2016