My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Roslyn Firemans Park
>
Meetings
>
2016
>
08. August
>
2016-08-16 10:00 AM - Commissioners' Agenda
>
Roslyn Firemans Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:43:06 AM
Creation date
6/13/2018 11:13:40 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Allocate $234,378 from the Hotel/Motel Funding for the Small-Scale Municipality-Owned Capital Projects and Operations - $93,973 to be used for Capital Projects, and $140,405 to be used for Operations
Order
10
Placement
Consent Agenda
Row ID
31338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIP 11-CRYSTAL CREEK RESTORATION AND WETLAND CREATION DEMONSTRATION PROJECT <br />Schedule: 2017 <br />Estimated Cost: $195,000 <br />This project will involve restoring an 850 foot portion of Crystal Creek to a natural state and enhancing <br />its water quality by creating a wetland buffer around it. Currently the creek channel is highly incised and <br />the alignment is straight. The creek restoration will involve re-grading the creek channel so that its <br />alignment is more natural. A wetland area will be created to provide a creek buffer. Because portions of <br />this project are located outside right-of-way, an easement may be required. <br />Figure 1 shows the locations of recommended projects discussed below and Table 2 shows the cost for <br />each project. Projects are listed in order of priority. Detailed cost estimates are provided in Appendix C. <br />STREET SYSTEM PLAN <br />Roslyn has approximately thirteen miles of streets, which are mainly chip sealed; a few sections <br />are asphalted where needed. Most streets have a sixty-foot wide right-of-way. Pennsylvania <br />Avenue has an BO-foot wide right of way. Snow plowing in the winter months takes up most of <br />Roslyn's street budget. Repairingthe snow-plow equipment and fuel also consume many budget <br />dollars. Roslyn's plow equipment consists of two 1970's secondhand graders, a used State <br />Department of Transportation plow/sand/dump truck and a backhoe the City purchased new in <br />1988. Another grader was given to the City in 1999 by the Summit at Snoqualmie and is used for <br />parts. <br />CAPITAL IMPROVEMENT PROJECTS: <br />ST-l-E. PENNSYLVANIA AVE <br />Schedule: 2016 <br />Estimated Cost: $3,067 <br />This project would include Chip-Sealing/Overlay from pt St to A 5t (435 ft) <br />5T-2 -E. DAKOTA AVE <br />Schedule: 2016 <br />Estimated Cost: $3,525 <br />This project would include Chip-Sealing from pt St to A St (500 ft) <br />ST-3-N A ST <br />Schedule: 2016 <br />Estimated Cost: $2,115 <br />This project would include Chip-Sealing/Overlay from E Dakota Ave to E Pennsylvania Ave (300 <br />ft) <br />ST-4-N BST <br />Schedule: 2016 <br />Estimated Cost: $2,115 <br />June 15, 2016
The URL can be used to link to this page
Your browser does not support the video tag.