Laserfiche WebLink
CIP 7A-STORM SEWER TRUNK LINE, SOUTH OF MONTANA <br />Schedule: 2017 <br />Estimated Cost: $1,720,000 <br />This project will replace the existing storm sewer trunk line parallel to South 1st Street south of <br />approximately Montana Avenue. The existing storm sewer trunk line is a 42-inch x 48-inch box culvert. <br />This system is immediately downstream of CIP 6 and additional capacity will be required following <br />completion of CIP 6. This project will install 1,140 feet of 4-feet-deep and 5-feet-wide box culvert to <br />provide capacity for the 10-year peak flow of 354 cfs. Because portions of this project are located <br />outside right-of-way, an easement will be required. <br />CIP 78 -STORM SEWER TRUNK LINE, SOUTH OF MONTANA -PARALLEL PIPE <br />Schedule: 2017 <br />Estimated Cost: $520,000 <br />An alternative to replacing the existing 42-inch-wide by 48-inch-high box culvert is to install a parallel <br />48-inch-diameter pipe. This project would install approximately 1,150 feet of 48-inch pipe, with an <br />upstream connection to the existing system and discharge to the open ditch downstream of the box <br />culvert. Because portions of this project are located outside of City right-of-way, an easement will be <br />required. <br />CIP 8 -STORM TRUNK LINE, MONTANA TO PENNSYLVANIA <br />Schedule: 2017 <br />Estimated Cost: $470,000 <br />This project will replace the existing stormwater conveyance parallel to South 1st Street between <br />Montana and Pennsylvania Avenues. This system is immediately downstream of CIP 1 and also <br />downstream of CIPs 2, 4 and s. Following completion of these upstream projects, this section of the <br />stormwater system will need to have increased capacity for the 10-year peak flow of 186 cfs. This <br />project will install 1,050 feet of 48-inch-diameter pipe. Because portions of this project are located <br />outside right-of-way, an easement will be required. <br />CIP 9 -HOFFMANVILLE CONVEYANCE <br />Schedule: 2017 <br />Estimated Cost: $300,000 <br />Currently no stormwater conveyance exists in South 2nd Street between West Hoffmanville and West <br />Wyoming Avenues. This project would construct 600 feet of 12-inch-diameter pipe in S 2nd Street and <br />the alley north of West Hoffmanville Avenue, and 600 feet of 24-inch-diameter pipe in South 1st Street <br />and East Hoffmanville Avenue. <br />CIP 10 -NORTH 1ST STREET, WASHINGTON TO NEVADA <br />Schedule: 2017 <br />Estimated Cost: $430,000 <br />This project will replace the existing stormwater conveyance parallel to and within North 1st Street <br />between Washington and approximately East Arizona Avenues. The new pipe will connect to the <br />existing 36-inch pipe installed in 2005. This system is immediately downstream of the connection of CIP <br />4 and CIPs 2 and 5 connect to this section of the stormwater system. Following completion of the <br />upstream projects, this section of pipe will need to have additional capacity for the 10-year peak flow of <br />approximately 170 cfs. This project will install 900 feet of 42-inch-diameter pipe. Because portions of <br />this project are located outside right-of-way, an easement will be required. <br />June 15, 2016