My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Roslyn Firemans Park
>
Meetings
>
2016
>
08. August
>
2016-08-16 10:00 AM - Commissioners' Agenda
>
Roslyn Firemans Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 8:43:06 AM
Creation date
6/13/2018 11:13:40 AM
Metadata
Fields
Template:
Meeting
Date
8/16/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Alpha Order
j
Item
Request to Allocate $234,378 from the Hotel/Motel Funding for the Small-Scale Municipality-Owned Capital Projects and Operations - $93,973 to be used for Capital Projects, and $140,405 to be used for Operations
Order
10
Placement
Consent Agenda
Row ID
31338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIP 7A-STORM SEWER TRUNK LINE, SOUTH OF MONTANA <br />Schedule: 2017 <br />Estimated Cost: $1,720,000 <br />This project will replace the existing storm sewer trunk line parallel to South 1st Street south of <br />approximately Montana Avenue. The existing storm sewer trunk line is a 42-inch x 48-inch box culvert. <br />This system is immediately downstream of CIP 6 and additional capacity will be required following <br />completion of CIP 6. This project will install 1,140 feet of 4-feet-deep and 5-feet-wide box culvert to <br />provide capacity for the 10-year peak flow of 354 cfs. Because portions of this project are located <br />outside right-of-way, an easement will be required. <br />CIP 78 -STORM SEWER TRUNK LINE, SOUTH OF MONTANA -PARALLEL PIPE <br />Schedule: 2017 <br />Estimated Cost: $520,000 <br />An alternative to replacing the existing 42-inch-wide by 48-inch-high box culvert is to install a parallel <br />48-inch-diameter pipe. This project would install approximately 1,150 feet of 48-inch pipe, with an <br />upstream connection to the existing system and discharge to the open ditch downstream of the box <br />culvert. Because portions of this project are located outside of City right-of-way, an easement will be <br />required. <br />CIP 8 -STORM TRUNK LINE, MONTANA TO PENNSYLVANIA <br />Schedule: 2017 <br />Estimated Cost: $470,000 <br />This project will replace the existing stormwater conveyance parallel to South 1st Street between <br />Montana and Pennsylvania Avenues. This system is immediately downstream of CIP 1 and also <br />downstream of CIPs 2, 4 and s. Following completion of these upstream projects, this section of the <br />stormwater system will need to have increased capacity for the 10-year peak flow of 186 cfs. This <br />project will install 1,050 feet of 48-inch-diameter pipe. Because portions of this project are located <br />outside right-of-way, an easement will be required. <br />CIP 9 -HOFFMANVILLE CONVEYANCE <br />Schedule: 2017 <br />Estimated Cost: $300,000 <br />Currently no stormwater conveyance exists in South 2nd Street between West Hoffmanville and West <br />Wyoming Avenues. This project would construct 600 feet of 12-inch-diameter pipe in S 2nd Street and <br />the alley north of West Hoffmanville Avenue, and 600 feet of 24-inch-diameter pipe in South 1st Street <br />and East Hoffmanville Avenue. <br />CIP 10 -NORTH 1ST STREET, WASHINGTON TO NEVADA <br />Schedule: 2017 <br />Estimated Cost: $430,000 <br />This project will replace the existing stormwater conveyance parallel to and within North 1st Street <br />between Washington and approximately East Arizona Avenues. The new pipe will connect to the <br />existing 36-inch pipe installed in 2005. This system is immediately downstream of the connection of CIP <br />4 and CIPs 2 and 5 connect to this section of the stormwater system. Following completion of the <br />upstream projects, this section of pipe will need to have additional capacity for the 10-year peak flow of <br />approximately 170 cfs. This project will install 900 feet of 42-inch-diameter pipe. Because portions of <br />this project are located outside right-of-way, an easement will be required. <br />June 15, 2016
The URL can be used to link to this page
Your browser does not support the video tag.