My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
>
Meetings
>
2018
>
05. May
>
2018-05-01 10:00 AM - Commissioners' Agenda
>
ResolutionAuthorizingChairSignatureJacobsTO3Amendment1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2018 12:17:08 PM
Creation date
5/14/2018 12:16:47 PM
Metadata
Fields
Template:
Meeting
Date
5/1/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
k
Item
Request to Approve a Resolution to Authorize the Chair's Signature on Jacobs Task Order No. 3 Amendment No. 1 Adding Additional Civil Engineering Services for the Teanaway Hydraulic Improvements Project
Order
11
Placement
Consent Agenda
Row ID
44352
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ Existing roadway as-builts and any other existing site data. <br />Deleted Assumptions: <br />• GENERAL <br />♦ The COUNTY will plan, arrange, and facilitate all meetings. <br />♦ The COUNTY is performing the following work: plans, specifications, and estimate <br />(excluding structural plans, specs, & estimate) for Lick Creek location; staging/detour <br />plans and MOT plans; all roadway and civil design; stream plans, planting plans, <br />revetment and associated stream alignments; stormwater analysis/design; structures <br />for private property access; hydraulic design at Storey Creek location; drainage design; <br />walls at bridge approaches, roadside safety; right-of-way plan development. <br />NEPA/SEPA <br />SEPA will be exempted as the project will qualify as a Fish Habitat Enhancement Project <br />through WDFW. <br />• ENVIRONMENTAL PERMITTING <br />♦ Individual Permit required for Corps 404 and Ecology 401. <br />• HYDRAULICS <br />♦ Story Creek <br />• CONSULTANT will serve as a mentor and review role. All documentation such as <br />hydraulic analysis, bank stability assessment and design, and scour analysis to be <br />performed by COUNTY. <br />♦ Lick Creek <br />COUNTY will provide combined topographic and bathymetric surface (i foot <br />contours with point and breakline data) with extents discussed at the 7/20/17 site <br />visit. <br />The creek will have geomorphic features (e.g. creek substrate, woody material, <br />etc) which will replicate the natural stream morphology above the existing road <br />crossing. <br />The hydraulic analysis will include information to support the design of the <br />Teanaway Road bridge and up to two (2) residential access bridges. <br />EXCLUSIONS <br />The added or deleted exclusions are shown below: <br />• Added Exclusions: <br />• ENVIRONMENTAL <br />♦ Supporting discipline reports. <br />♦ Full Cultural Resources monitoring during construction. <br />♦ CWA Section 404 Individual Permit <br />♦ Department of Ecology CWA Section 401 Water Quality Certification <br />♦ Long-term mitigation and site management <br />Scope of Service_Teanaway Hyd Imp_Amend 01_2018-0419 <br />Page 18 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.