My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoRatifyCoEngSignatureTO12
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
ResolutiontoRatifyCoEngSignatureTO12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:25:31 PM
Creation date
4/10/2018 2:24:55 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
u
Item
Request to Approve a Resolution to Ratify the County Engineer's Signature on Task Order No. 12 with KPFF
Order
21
Placement
Consent Agenda
Row ID
42911
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />KPFF CONSULTING ENGINEERS <br />August 24, 2017 <br />ivoieyc ns detweed sunrise, and sunset - znr = available inspection ugrit <br />Total number of bridges / structures - a5 AVERAGE COST PER STRUCTURE _ S53567 <br />Pr act <br />TobmW91 <br />Protect <br />Design <br />Prated <br />! <br />Manager <br />Specialst <br />Engineer- <br />Engineer <br />9 <br />Adminisbabo'',. <br />MULTIPLIER <br />- <br />(OA/OC) <br />Team Leader <br />r. <br />ITEM SCOPE DESCRIPTION <br />6923 $5923 $4240 $3989 $2648 <br />2.6552 <br />1 <br />MANAGEMENT (5 months) <br />ContraU Co planta <br />1.5 <br />3.0 <br />$613 <br />l i P ,act Summaries <br />_ <br />I <br />20 <br />5.0 <br />50 <br />¢1.2x2 <br />Client C0,1,11cations me, email phone) <br />__._.. <br />a.0 <br />15.0 <br />$3 159 <br />Project Coordination (ntemal l external) <br />6.0 <br />15.0 <br />$2792 <br />Management Labor Subtotal: <br />17.5 <br />0.0 <br />___... <br />38.0 <br />0.0 <br />6.0 <br />E7,e46 <br />2 <br />TRAVEL TO SITE - RT <br />Tai Ellensburg I Seattle RT - Assume 6 trips <br />6.0 <br />4.0 <br />240 <br />$2,702 <br />Travel Labor Subtotal:l <br />0.0 ! <br />0.0 <br />24.0 <br />0.0 <br />0.0 <br />$2,702 <br />.77 <br />3 <br />INSPECTION <br />MarJReviewlEquipment P.P laswme 15 in per <br />31 <br />bridge November -December and 25 min per bridge <br />$4,278 <br />Feb -April). <br />November Trips 12) <br />2 <br />150 <br />15.0 <br />15o <br />-� <br />$i 589 <br />December Trip <br />1 <br />90 <br />90 <br />9.0 <br />gp1a <br />February Trip <br />1 <br />6.0 - <br />6.0 <br />6.0 <br />Si <br />'.. March Trip <br />1 <br />'.. <br />5.0 <br />50 <br />-0 _ <br />$563 <br />'April Trip <br />1 <br />30 <br />30 <br />_ <br />3.0 <br />... $335 <br />32 <br />'Bridge Inspection - Field WOM <br />613,059 <br />November Trips (2) Q5 hrlday = 8 days) <br />42 <br />03 <br />10 <br />55.4 <br />56 <br />$5305 <br />December Trip (] Mlday = 6 tlays) <br />28 <br />03 <br />1 C <br />37 2 <br />360 <br />gq 276 <br />February Trip (8 hrday=2days) <br />9 <br />03 <br />10 <br />120 <br />12.0 <br />$1351 <br />all Trip Shirai l day) <br />a <br />03 <br />10 <br />67 <br />] 0 <br />$780 <br />April Trip (11 M/tlay=1day) <br />2 ; <br />03 <br />10 <br />27 <br />3,0 <br />Ill <br />3 3 <br />Inspection Reports -ONice Work <br />$12,616 <br />Preparation (by County) (assume 10,,n Irbil <br />70 <br />Review Report- Rputind <br />23 <br />iC <br />230 <br />40 <br />230 <br />$3325 <br />Review Report- Under 20 FT <br />4. <br />05 '' <br />23.5 <br />80 <br />240 <br />$4,172 <br />Preparation toy KPFF)- Urdar 20 FT <br />14 <br />. <br />' 5 <br />21 0 <br />23 <br />21 C <br />52787 <br />Preparation toy KPFF)- Routine <br />"e <br />2 5 'I, <br />5 0 <br />C.5 <br />5.0 <br />6655 <br />S!gmngl Subm4ti1g Final <br />39 <br />0.3 'I <br />98 <br />30 <br />100 <br />$1.677 <br />Inspection Labor Subtotal: <br />1] <br />q3.0 <br />6.0 234.6 <br />0.0 <br />11.8 <br />237.0 <br />0.0 <br />0.0 <br />629,954 <br />34 <br />Management Reserves <br />Additional Inspectionr Report Time <br />20 <br />80 <br />$1.208 <br />Adtati Per Diem <br />_ - $181 - <br />Labor Subtotal <br />E1 449 <br />60 <br />TOTAL LABOR HOURS <br />ITS <br />17.0 <br />299.0 <br />0.0 <br />5.0 <br />3"3 <br />TOTAL LABOR COST: <br />5 <br />41,951 <br />r <br />O <br />TOTAL REIMBURSABLE COSTS <br />$ 4,116 <br />TOTAL PROJECT COST <br />6 46,06).22 <br />ivoieyc ns detweed sunrise, and sunset - znr = available inspection ugrit <br />Total number of bridges / structures - a5 AVERAGE COST PER STRUCTURE _ S53567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.